Backbone Prioritization Sample Clauses

Backbone Prioritization. Backbone Prioritization is an optional feature available with individual domestic Private Ports. When this feature is configured on a Private Port, traffic originating from that Port will be designated at a higher class of service to the Supplier IP network than traffic originating from Private Ports without the feature or Internet Ports. If Authorized User desires Backbone Prioritization for traffic between two or more Private Ports, the feature must be ordered for each Private Port. The benefit from Backbone Prioritization is realized during periods of high network congestion. Backbone Prioritization may not be available at all locations or with Multicast in certain circumstances.
AutoNDA by SimpleDocs

Related to Backbone Prioritization

  • Prioritization All reported incidents receive a priority number based on the impact and urgency of the service interruption. Impact is determined based on the number of people/departments/buildings that are affected by the interruption or outage. Life-Safety issues are taken into consideration for assessing and assigning priorities. Urgency is based on the acceptable delay to restore the service. Urgency can be critical or high and is determined based on the nature of the service outage. UNM IT may prioritize incoming incident requests as P1 or P2 priority if it meets one or more of the following criteria:  Significant number of people affected;  The level to which work is impaired for individuals;  Academic and Administrative Calendar deadlines;  Significant impact on the delivery of instruction;  Significant risk to safety, law, rule, or policy compliance.

  • Telephone Service Prioritization; 4.1.4.11.2 Related services for handicapped;

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Project Website The State will develop and maintain a website that will be made available in advance of the first public meeting for this project. The Engineer shall provide project information for the project website to the State including documents related to project background, study area limits, study objectives, project photos, study area maps, material presented at public meetings, and contact information for requesting additional information. The project website will be updated with the documents and other information provided by the Engineer to the State after each set of public meetings and the final report in PDF format provided by the Engineer will be posted by the State to give the general public access to the document.

  • Maintenance Plan Maintenance plan for the Project Facility for the next quarter and a report on maintenance carried out during the previous quarter (including any material deviation from expected maintenance activities as set out in the maintenance plan).

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.