BASIN ASSEMBLY Sample Clauses

BASIN ASSEMBLY. The basin shall be made of high density polyethylene, fiberglass reinforced polyester resin, or similar non-corrosive material, and shall be designed to withstand and function properly under saturated soil loading and other environmental conditions associated with direct burial. The basin shall be furnished with the appropriate fitting (s) to accept a 4.50” OD DWV pipe for house connection. All discharge piping within the basin shall be constructed of 304 Series Stainless Steel and terminate outside the access way bulkhead with a stainless steel, 1 ¼ inch female NPT fitting. The bulkhead penetration shall be factory installed and warranted by the manufacturer to be watertight. The discharge piping shall include a manual ball shut-off valve to allow service of the unit, as well as an anti-siphon valve to protect the basin from evacuating and the pump from losing prime under negative pressure conditions.
AutoNDA by SimpleDocs

Related to BASIN ASSEMBLY

  • Assembly (1)(a) The Contracting Parties shall have an Assembly.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • FABRICATION Making up data or results and recording or reporting them.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • PIONEERING Pioneering may not extend past construction that will be completed during the current construction season. Pioneering may not extend more than 500 feet beyond completed construction unless approved in writing by the Contract Administrator. In addition, the following actions must be taken as pioneering progresses:  Drainage must be provided on all uncompleted construction.  Road pioneering operations may not undercut the final cut slope or restrict drainage.  Culverts at live stream crossings must be installed during pioneering operations prior to embankment.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

Time is Money Join Law Insider Premium to draft better contracts faster.