BID OPENING All duly received bids will be opened immediately after the scheduled closing time of Bids at the same venue. Bidders or their accredited agents could be present at the time of opening of bids.
Monitoring and Review The Provider agrees to allow access to the Department for purposes of monitoring and review. This access includes but is not limited to client records, fiscal records, staffing records, policy and procedural manuals, facilities, staff, and children in care of the Department. The Department will conduct quality reviews, which may include site-based quality review visits.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Training and Professional Development 11.1 The Employer will develop and maintain an employee training and development plan and provide such plan to the Union upon request. Staff training is intended to provide an opportunity for classified staff employees for training sponsored by the University Training and Development and the UW Medical Centers Organizational Development and Training. Education/Professional Leave is intended to facilitate employee access to continuing education opportunities. Training and educational/professional leave may be used for the purpose of improving job performance, maintaining and increasing proficiency, preparing staff for greater responsibility, or increasing promotional opportunities within the framework of staff positions available at the University. 11.2 Any release time for training for employees accepted for such classes shall be in accordance with the Executive Order (currently No. 52) governing this matter. In the event that two or more employees request the same training period and supervision must limit the number of persons who may participate at one time due to work requirements, the selection will be made on a mutually agreeable basis within the department. 11.3 The training program is a proper subject for discussion by either departmental or University-wide Joint Union/Management Committees. 11.4 If the Employer requires an employee to receive training, reimbursement will be provided in accordance with the University travel rules. Employee attendance at Employer required training, either during or outside working hours, will be considered time worked and compensated in accordance with the provisions of this Agreement. 11.5 Employee attendance at training not required by the Employer and not covered by Executive Order 52, either on approved leave from or outside of working hours, will be voluntary and not considered time worked.
Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.
Job Openings The District shall be considered to be engaged in the procedure to fill the position on the posting date of the position(s). Posting shall occur within fifteen (15) working days after Executive Vice Chancellor of Human Resources approval. If the District is unable to post the position within fifteen (15) days or fill the position within the ninety (90) day period, the District will meet and confer with CSEA. Substitute employees may not work more than ninety (90) calendar days in a substitute assignment while the District is engaged in a procedure to fill the vacant permanent position. Should a position be vacated through retirement, resignation or any other reason the District agrees that the position will not be filled by any person(s) for more than one hundred and twenty (120) calendar days excluding temporary upgrades of bargaining unit members. 17.5.1 Unit employees shall be given consideration for reassignment to a higher classification when their training and ability demonstrate that they are qualified for such reassignment. The District will prepare vacancy lists as new openings are announced. Each vacancy shall be assigned a reference number. This reference number shall be used on the Board docket as a method of identifying the position being filled. Vacancy lists will be distributed via e-mail to unit employees, CSEA, posted on designated bulletin boards and the district website. Individual job announcements will be prepared separately and made available to interested employees upon request. 17.5.1.1 Where a pool of qualified applicants for a position existed from a recruitment conducted within the six (6) months preceding the new opening, that pool may be used for the new opening in the same classification. This does not preclude existing unit employees from applying for openings per Article 17.2.2. All new openings shall be internally advertised. 17.5.2 A permanent unit employee who acquires probationary status as the result of job openings or recruitment shall retain permanent status in his former classification until completion of the probationary period in the new classification. In the event that the probationary period in the new classification is not successful, the employee shall revert to his former classification with all the previous rights and privileges. 17.5.3 Unit employee applicants shall be furnished notification of time and date of scheduled interviews a minimum of five (5) days prior to such interviews. 17.5.4 Job openings - Unit employees hired into permanent positions must meet minimum qualifications. 17.5.5 Short-term or substitute employees must meet the minimum qualifications for the classification under which they are employed.
Screening and Assessment Grantee shall: 1. Comply with all applicable rules in the TAC for SUD programs as stated in the SUD UM Guidelines Information, Rules, and Regulations regarding Screening and Assessment. 2. When documenting a CMBHS Substance Use Disorder screening, Grantee shall conduct the screening in a confidential, face-to-face interview unless there is documented justification for an interview by phone. 3. Document Financial Eligibility in CMBHS as required in the SUD UM Guidelines. 4. Conduct and document a CMBHS SUD Initial Assessment with the client to determine the appropriate levels of care for SUD treatment. The CMBHS assessment will identify the impact of substances on the physical, mental health, and other identified issues including Tuberculosis, Hepatitis C, sexually transmitted infection (STI), and Human Immunodeficiency Virus (HIV). i. If client indicates risk for these communicable diseases, Grantee shall refer the client to the appropriate community resources for further testing and counseling. ii. If the client is at risk for HIV, Grantee shall refer the client to pre and post- test counseling on HIV. 5. Grantee will also consider referring to the TRA Statewide HIV Intensive Residential Treatment facility to concurrently address medical needs and SUD. 6. If a client is living with HIV, Grantee will refer the client to the appropriate community resources to complete the necessary referrals and health related paperwork. 7. The assessment shall be signed by a Qualified Credential Counselor (QCC) and filed in the client record within three (3) service days of admission or a program may accept an evaluation from an outside entity if it meets the criteria for admission and was completed during the thirty (30) business days preceding admission.
COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.
Quality Assurance Program An employee shall be entitled to leave of absence without loss of earnings from her or his regularly scheduled working hours for the purpose of writing examinations required by the College of Nurses of Ontario arising out of the Quality Assurance Program.
ACADEMY OPENING DATE The Academy shall open as a school on 1 April 2011 replacing Xxxxxxx School which shall cease to be maintained by the Local Authority on that date, which date shall be the conversion date within the meaning of the Academies Xxx 0000.