Billing Parameters Sample Clauses

Billing Parameters. 4.5.1. Channel - DS0 level. Connection to Paging Provider’s Point of Connection from the Serving Wire Center. 4.5.2. Channel Facility (for digital service) - DS1 level. Twenty-four digital voice grade channels can be transmitted over one DS1 facility. A full DS1 is necessary for the addition of voice grade channels even if ordered in increments of less than 24. The transmission rate is 1.544 Mbps. 4.5.3. Channel Facility (for digital service) - DS3 level. Twenty-eight DS1s, including their associated digital voice grade channels, can be transmitted over one DS3 facility. When using a DS3 traffic aggregation level, a full DS3 is necessary for the addition of DS1s even if ordered in increments of less than 28. The facility transmission rate is 44.736 Mpbs. 4.5.4. Channel Performance. Conditioning to extend signaling on a two- wire analog channel when there is dedicated transport.
AutoNDA by SimpleDocs
Billing Parameters 

Related to Billing Parameters

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • SAMPLE (If applicable and the project has specifications, insert the specifications into this section.)

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Packing Specifications 7.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Preparatory Contract Negotiations Meetings Where operational requirements permit, the Employer will grant leave without pay to an employee to attend preparatory contract negotiations meetings.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • BILLING PROCEDURE a. The Contractor shall submit, not more than semi-monthly, properly completed A-19 vouchers (the "voucher") to one of the following: The Department of Children, Youth, and Families Attn: Xxxxx Xxxx PO Box 40972 Olympia WA 98504-0972 Or, email a scan of an original, signed A-19 voucher directly to the DCYF Contract Manager at Xxxxx.xxxx@xxxx.xx.xxx b. Payment to the Contractor for approved and completed work shall be made by warrant or Electronic Funds Transfer by DCYF and considered timely if made within 30 days of receipt of a properly completed voucher. Payment shall be sent to the address designated by the Contractor and set forth in this Contract. c. Each voucher must clearly reference the DCYF Contract Number and the Contractor's Statewide Payee Registration number assigned by the Office of Financial Management (OFM). d. Properly completed vouchers and attachments completed by the Contractor must contain the information described in Exhibit A under the Section titled "Compensation and Voucher Payment".

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following: