Bioretention Basins Sample Clauses

Bioretention Basins. Construct bioretention basins as shown in the Plans, or as modified by the Engineer, after final grade and stabilization of the area upstream of each bioretention basin are achieved. If this is not feasible, stormwater flow shall be diverted around the bioretention basin and the basin area protected with temporary erosion and sediment control measures. Once the basin has been stabilized, vegetation shall be established within the bioretention basin per the details shown in the plans. Contractor shall maintain the bioretention basin after construction as outlined in the GDOT Stormwater System Inspection and Maintenance Manual until the project is turned over.
AutoNDA by SimpleDocs
Bioretention Basins. Bioretention basins are measured for payment by the entire basin constructed at each location complete in place and accepted. The outlet control structure, underdrain system, engineered soil mix, mulch, any pretreatment (e.g. forebay), any landscape plants, any signage, any outlet pipe, and any outlet apron and/or other energy dissipation devices are included in the cost of the bioretention basin. Permanent grassing is incidental.
Bioretention Basins. Bioretention basins are paid for at the Contract Unit Price per each. The outlet control structure, any outlet pipe, any pretreatment (e.g. forebay), any landscape plants, any signage, and any outlet apron and/or other energy dissipation devices are paid for in the overall cost of the bioretention basin. Payment is full compensation for:  Furnishing the material and labor  Preparation and grading required to construct bioretention basins  Installation of the drainage aggregate, nonwoven plastic filter fabric, and complete underdrain system as shown in the details for construction of bioretention basins  Installation of the permeable engineered soil mix, and mulch, as shown in the details for construction of bioretention basins  Installation of landscape plantings as shown in the plans for construction of bioretention basins  Any other incidentals such as but not limited to pipe fittings and connections to other specified structures required to construct bioretention basins

Related to Bioretention Basins

  • Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff. If Purchaser fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Purchaser shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits under B4.218.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Musculoskeletal Injury Prevention and Control (a) The Hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

  • Outpatient Dental Anesthesia Services This plan covers anesthesia services received in connection with a dental service when provided in a hospital or freestanding ambulatory surgical center and: • the use of this is medically necessary; and • the setting in which the service is received is determined to be appropriate. This plan also covers facility fees associated with these services.

  • Gold Open Access Articles May be shared according to the author-selected end-user license and should contain a CrossMark logo, the end user license, and a DOI link to the formal publication on ScienceDirect. Please refer to Elsevier's posting policy for further information.

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

  • Workplace Violence Prevention A. In order to provide a safe and healthy workplace for employees, the State agrees to develop and implement "Workplace Violence Prevention" policies and programs.

  • Prosthodontics We Cover prosthodontic services as follows: • Removable complete or partial dentures, for Members 15 years of age and above, including six (6) months follow-up care; • Additional services including insertion of identification slips, repairs, relines and rebases and treatment of cleft palate; and • Interim prosthesis for Members five (5) to 15 years of age. We do not Cover implants or implant related services. Fixed bridges are not Covered unless they are required: • For replacement of a single upper anterior (central/lateral incisor or cuspid) in a patient with an otherwise full complement of natural, functional and/or restored teeth; • For cleft palate stabilization; or • Due to the presence of any neurologic or physiologic condition that would preclude the placement of a removable prosthesis, as demonstrated by medical documentation.

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!