Block Loading Sample Clauses

Block Loading. Operational mode of a powerhouse in which the generation capacity (and resulting cfs release) is held at or near a constant level for an extended period of time.
AutoNDA by SimpleDocs
Block Loading. To minimize the frequency of 1) fluctuation in the river stage and 2) Ramping Rates that may be above the natural rise or fall rate of the NFFR, Licensee has implemented a practice of Block Loading Xxxxxx Powerhouse at times when the flow at the NF 57 stream gage is between the Minimum River Flow and 3,000 cfs. Within this flow range, if the flow rate on Xxxxxx needs to be increased or decreased from Block Loading levels between 0 and 40 MW, Licensee shall, to the extent reasonably possible, make adjustments to Xxxxxx Powerhouse flows so as not to exceed, below Project dams, the basic Ramping Rates in Appendix A, Section II.5.A. Licensee cannot operate Xxxxxx Powerhouse between 40 and 70 MW and if a transition between these levels is needed, Licensee will attempt to accomplish this transition with as little impact on these ramping rates as possible. Licensee agrees to continue this Block Loading practice during March, April and May until such time as a level for Ramping Rates may be established under Licensee’s Project No. 2105 license such that such fluctuations are no longer a concern. Bucks Creek Powerhouse feeds water into Cresta Reservoir and is typically cycled to follow daily system electric loads. As the maximum flow rate of this powerhouse is less than 400 cfs and the impact of cycling is damped by Cresta Reservoir, Block Loading is not required through Bucks Creek Powerhouse.

Related to Block Loading

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Leave Loading 10.2 The employer and the individual employee must have genuinely made the agreement without coercion or duress.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.