Building and Construction Project means Sample Clauses

Building and Construction Project means. (i) all on-site work on a construction project on which the Employer carries out work covered by this Agreement in conjunction with project work that is construction, fabrication, erection, demolition or removal of a building or structure or part of a building or structure or road construction.
AutoNDA by SimpleDocs
Building and Construction Project means a) all on-site work on a construction project on which the Employer carries out work covered by this Agreement in conjunction with project work that is construction, fabrication, erection, demolition or removal of a building or structure or part of a building or structure or road construction. but does not include: I. any of the following activities in an existing building/structure at an establishment where products are being manufactured or services rendered: ▪ general installations of plant and equipment, unless in conjunction with a construction project); and/or ▪ maintenance of plant and equipment; and/or ▪ capital project work within existing plant facilities, maintenance and/or revamp work, plant modifications and/or shutdown work;

Related to Building and Construction Project means

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

Time is Money Join Law Insider Premium to draft better contracts faster.