COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order. (b) The technical evaluation committee may call the responsive bidders for discussion or presentation to facilitate and assess their understanding of the scope of work and its execution. However, the committee shall have sole discretion to call for discussion / presentation. (c) Financial bids of only those bidders who qualify the technical criteria will be opened provided all other requirements are fulfilled. (d) AIIMS Jodhpur shall have right to accept or reject any or all tenders without assigning any reasons thereof.
Accident Prevention Health and Safety Committee (a) The Employer and the Union agree that they mutually desire to maintain standards of safety and health in the workplace in order to prevent accidents, injury and illness. (b) Recognizing its responsibilities under the applicable legislation, the Employer agrees to accept as a member of its Accident Prevention – Health & Safety Committee at least three (3) representatives, one from each base, selected or appointed by the Union from amongst bargaining unit employees. At any time where a vote is required, an equal number of representatives from each side shall be entitled to vote. (c) Such Committee shall identify potential dangers and hazards, institute means of improving health and safety programs and recommend actions to be taken to improve conditions related to safety and health. (d) The Employee agrees to co-operate reasonably in providing necessary information to enable the Committee to fulfill its functions. (e) Meetings shall be held quarterly or more frequently at the call of the Chair if required. The Committee shall maintain minutes of all meetings and make the same available for review. (f) Any representative appointed or select in accordance with (b) hereof shall serve a term of one (1) calendar year from the date of appointment which may be renewed for further periods of one (1) year. The Union will encourage its representative(s) to serve at least one (1) year. Time off for such representative(s) to attend meetings of the Accident Prevention – Health & Safety Committee in accordance with the foregoing shall be granted and time so spent attending such meetings shall be deemed to be work time for which the representative(s) shall be paid by the Employer at his regular or premium rate as may be applicable. (g) The Union agrees to endeavour to obtain the full co-operation of its membership in the observation of all safety rules and practices. (h) Pregnant employees may request to be transferred from their current duties if, in the professional opinion of the employee’s physician, the pregnancy may be at risk. If such a transfer is not feasible, the pregnant employee, if she so requests, will be granted an unpaid leave of absence before commencement of the maternity leave referred to in Article 16.04
Training and Development 3.1 Authorities will develop local 'Workforce Development Plans (see Part 4.8),' closely linked to their service delivery plans, which will provide the focus for the establishment of training and development priorities. Training and development should be designed to meet the corporate and service needs of authorities both current and in the future, taking into account the individual needs of employees. Local schemes on training and development should enable authorities to attain their strategic objectives through development of their employees. Training and development provisions should be shaped to local requirements and take account of the full range of learning methods. Such an approach should enable access to learning for all employees. The needs of part time employees and shift workers need particular consideration. 3.2 Employees attending or undertaking required training are entitled to payment of normal earnings; all prescribed fees and other relevant expenses arising. Employees are also entitled to paid leave for the purpose of sitting for required examinations. When attending training courses outside contracted daily hours, part-time employees should be paid on the same basis as full- time employees. (Assistance for other forms of learning, for example that directed at individual development, will be locally determined). Some training can be very expensive and authorities may require repayment of all or part of the costs incurred should an employee leave the authority before a reasonable time period has expired. The authority's policy in this regard should be made explicit. 3.3 Objectives for training and development programmes should include the following: • To enable Councils to attain their strategic objectives via investment in their employees. • To promote equity of access to learning. • To encourage employees to develop their skills and level of responsibility to the maximum of their individual potential. • To widen and modernise the skills profile of employees to maximise their versatility, employability and so, job security. • To enable employees to raise productivity, quality and customer service in pursuit of sustainable improvement 3.4 Authorities should establish local partnership arrangements, to include recognised trade unions, to develop their local workforce development plans. 3.5 The NJC endorses partnership provision such as the "Return to Learn" scheme. Authorities and the recognised trade unions shall encourage and support employees taking on the statutory Union Learning Representative (ULR) role. This will include agreeing facilities and paid release in accordance with statutory provisions. ULRs should be enabled to play a full part in promoting and implementing local training and development programmes.
RESEARCH AND PUBLICATION 29 CONTRACTOR shall not utilize information and/or data received from COUNTY, or arising out 30 of, or developed, as a result of this Agreement for the purpose of personal or professional research, or 31 for publication. 32
Monitoring and Evaluation a. The AGENCY shall expeditiously provide to the COUNTY upon request, all data needed for the purpose of monitoring, evaluating and/or auditing the program(s). This data shall include, but not be limited to, clients served, services provided, outcomes achieved, information on materials and services delivered, and any other data required, in the sole discretion of the COUNTY, that may be required to adequately monitor and evaluate the services provided under this Contract. Monitoring shall be performed in accordance with COUNTY’S established Noncompliance Standards, a copy of which is attached hereto and incorporated by reference as Attachment “C”. b. The AGENCY agrees to permit persons duly authorized by the COUNTY to interview any clients and all current and/or former employees of the AGENCY to be assured of the AGENCY’S satisfactory performance of the terms of this Contract. c. Following such evaluation, monitoring, and/or audit, the COUNTY will deliver a report of its findings and recommendations with regard to the AGENCY’S conformance with this Contract’s terms and conditions to the AGENCY and/or Board of Directors’ President, and members, whenever applicable. If deficiencies are noted, a written notice of corrective action will be issued to the AGENCY which will specify deficiencies and provide a timeline for correction of those deficiencies. Within the designated timeframe in the written notice of corrective action, the AGENCY shall submit to the COUNTY’S CCC manager (“Manager”), or their designee, a corrective action plan to rectify all deficiencies identified by the COUNTY. d. Failure by the AGENCY to correct noted deficiencies, as outlined in the written notice of corrective action, may result in the AGENCY being deemed in breach of the Contract terms. e. The AGENCY shall cooperate with the COUNTY on all reviews to ensure compliance with all applicable COUNTY guidelines and requirements for general fund recipients.
Program Monitoring and Evaluation The Recipient shall prepare, or cause to be prepared, and furnish to the Association not later than six months after the Closing Date, a report of such scope and in such detail as the Association shall reasonably request, on the execution of the Program, the performance by the Recipient and the Association of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Financing.”
Industrial Relations Training Leave Union Delegate/Employee Representative shall have access to industrial relations training in accordance with Appendix E hereof.
Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.