FREQUENCY AND CAPACITY LEVELS 7 frequencies per week, with no restrictions to capacity and aircraft type
Contract Capacity The electric power producing capability of the Generating Facility which is committed to Edison.
Action in Shareholder Capacity Only The parties acknowledge that this Agreement is entered into by Shareholder solely in such Shareholder’s capacity as the Beneficial Owner of such Shareholder’s Owned Securities and nothing in this Agreement restricts or limits any action taken by such Shareholder in its capacity as a director or officer of the Company or any of its Affiliates and the taking of any actions (or failure to act) in its capacity as an officer or director of the Company, or any of its Affiliates, will not be deemed to constitute a breach of this Agreement, regardless of the circumstances thereto.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Power and Capacity The Shareholder has the power, authority and capacity to enter into this Agreement and to consummate the transactions contemplated hereby. This Agreement constitutes the Shareholder’s valid, legal and binding obligation and is enforceable against the Shareholder in accordance with its terms, subject, however, as to enforcement, to bankruptcy, insolvency, fraudulent transfer, moratorium and similar laws of general applicability relating to or affecting creditors’ rights;
Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.
Shareholder Capacity By executing and delivering this -------------------- Agreement, Shareholder makes no agreement or understanding herein in his capacity as a director or officer of the Company or any subsidiary of the Company. Shareholder signs solely in his capacity as the beneficial owner of Shareholder's Shares and nothing herein shall limit or affect any actions taken by Shareholder in his capacity as an officer or director of the Company or any subsidiary of the Company.
Capacity Building 1. Contractor will work in partnership with AOD to study the viability of billing under Drug Medi-Cal and 3rd party payer. 2. Contractor will document and track consumers who are CalWORKS eligible.
Switching and Tagging Rules The Developer and Connecting Transmission Owner shall each provide the other Party a copy of its switching and tagging rules that are applicable to the other Party’s activities. Such switching and tagging rules shall be developed on a nondiscriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.