Capacity of Solar PV Projects Sample Clauses

Capacity of Solar PV Projects i) The rated capacity to be installed shall be considered as minimum DC Arrays Capacity and maximum AC Capacity at the delivery point as described below: Sr. No. Solar PV Project Capacity Bid Minimum DC Arrays Capacity to be installed Minimum Rated Inverter Capacity Maximum AC Capacity Limit at Delivery point 1 50 MW 50 MW 50 MW 50 XX
AutoNDA by SimpleDocs
Capacity of Solar PV Projects a. The SPD shall be required to demonstrate compliances with the “Annexure-B: Scope of work, technical specifications & standards for grid-connected solar pv systems/power plants” as mentioned in the RfS.
Capacity of Solar PV Projects i) The Project configuration shall be allowed as per the following matrix: Sr. No. Solar PV Project Capacity Bid Minimum DC Arrays Capacity to be installed Minimum Rated Inverter Capacity* Maximum AC Capacity Limit at Delivery point 1 300 MW 300 MW 300 MW 300 MW 2 350 MW 350 MW 350 MW 350 MW 3 400 MW 400 MW 400 MW 400 MW 4 450 MW 450 MW 450 MW 450 MW 7 600 MW 600 MW 600 MW 600 MW 8 650 MW 650 MW 650 MW 650 MW 10 750 MW 750 MW 750 MW 750 MW 11 800 MW 800 MW 800 MW 800 MW 12 850 MW 850 MW 850 MW 850 MW 13 900 MW 900 MW 900 MW 900 MW 14 950 MW 950 MW 950 MW 950 MW
Capacity of Solar PV Projects i) The Project configuration shall be allowed as per the following matrix: Sr. No. Solar PV Project Capacity Bid Minimum DC Arrays Capacity to be installed Minimum Rated Inverter Capacity* Maximum AC Capacity Limit at Delivery point 1 50 MW 50 MW 50 MW 50 MW 5 250 MW 250 MW 250 MW 250 MW 8 400 MW 400 MW 400 MW 400 MW *In case the rated inverter capacity is mentioned in kVA, the IEC test certificate declaring thepower factor of the Inverter/PCU at rated power has to be submitted and the power factor shall be multiplied by the kVA rating to calculate the rated capacity of the inverter in kW.

Related to Capacity of Solar PV Projects

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.