CARPENTRY & JOINERY Sample Clauses

CARPENTRY & JOINERY. Quantity Split: Quantity
AutoNDA by SimpleDocs
CARPENTRY & JOINERY. Wooden Floors Repair, sand and seal wooden flooring will only be applicable to the sections of the floor that are being repaired. Remove timber skirting m 5.00 Remove timber flooring m² 23.00 Replace parquet flooring (includes sanding and varnish) m² 445.00 Replace loose parquet blocks (includes cleaning, sanding and varnish) m² 240.00 Suspended strip flooring (SA Pine select) m² 350.00 Suspended strip flooring (Oregon pine) m² 595.00 Sand and seal strip flooring m² 90.00 Repair, sand and seal wooden flooring m² 205.00 Timber deck flooring m² 550.00 SA Pine skirting 76 x 19mm m 28.00 Meranti skirting 76 x 19mm m 34.00 Meranti quadrant 18mm m 11.00 Door Frames Take out and remove single door and frame No 85.00 Take out and remove double door and frame No 110.00 Supply and build in pressed steel door frame 110mm wall No 455.00 Supply and build in pressed steel door frame 220mm wall No 510.00 Supply and build in pressed steel double door frame 110mm wall No 570.00 Supply and build in pressed steel door frame with fanlight 110mm wall No 675.00 Supply and build in combination steel door and frame 110mm wall No 790.00 Supply and build in Saligna door frame No 475.00 Supply and build in Meranti standard single door frame No 595.00 Supply and build in Meranti standard double door frame No 650.00 Supply and build in Meranti pivot door frame No 975.00 Aluminium door frame -Supply quote Item Quote Aluminium door frame -Add 10% xxxx-up for contractors allowance Item Percentage Build in aluminium door and frame No 495.00 Doors The formula to be used is: Choose the door from the list The rate include the door and all the furniture (locks and hinges etc) Add the labour to hang the door The labour rate includes the furniture ( locks and hinges etc) Use double the rate for double doors Hollow core door hardboard No 425.00 Hollow core door sapele veneer No 495.00 Semi-solid door hardboard No 460.00 Semi-solid door sapele veneer No 620.00 Solid Meranti 2 panel door No 1,150.00 Solid Meranti 8 panel door No 1,850.00 Solid Meranti stable door No 925.00 Pine stable door No 580.00 Labour to hang single hollow core door No 305.00 Labour to hang single solid door No 395.00 Labour to hang stable door No 490.00 Labour to hang pivot doors No 825.00 Labour to hang sliding door with pelmet No 325.00 Aluminium door -Supply quote Item Quote Aluminium door -Add 10% xxxx-up for contractors allowance Item Percentage Windows Remove window frame N o 88.00 Supply window frame -Supply quote Ite...
CARPENTRY & JOINERY. PREAMBLES The contractor is referred to the General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors before pricing this bill.

Related to CARPENTRY & JOINERY

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.

  • List of Operator’s Subprocessors [Box 26] [Box 27] [Box 28] [Box 29]

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • PROJECT REPRESENTATION BEYOND BASIC SERVICES 1.2.1. The State may at its option secure the services of a person or persons known as a Clerk-of-the-Works, referred to herein as a "Clerk". The Clerk(s) shall, for all purposes of this Agreement, report and be solely responsible to the State. The State may at any time dismiss the Clerk(s) for cause or convenience; however, any such action shall not affect the State's and ARCHITECT/ENGINEER'S obligations under this Agreement. In such event, the State shall use their best efforts to secure the services of a Clerk or Clerks under this paragraph as soon as is practicable if the State deems it necessary.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Professional Growth and Improvement Plans A. Professional growth and improvement plans shall be developed as follows:

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.