Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.
Fabrication Making up data or results and recording or reporting them.
Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.
ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.
FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.
Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Platby (a) Všechny platby budou vypláceny těmto příjemcům (dále jen "Příjemce platby" či "Příjemci platby") v souladu s rozdělením poplatků definovaným v Příloze B: Fakultní nemocni ce v Motol e X Xxxxx 00 000 00 Xxxxx 0, Xxxxx xxxxxxxxx XX 0006420 3 fakturykhl @fnmotol .cz xxx (b) Schválené platby za Klinické hodnocení a související služby, které má Poskytovatel provádět, jsou uvedeny v rozpočtu přiloženém k této Smlouvě jako Příloha B a začleněny zde odkazem ("Příloha B"). Platby uvedené v Příloze B zahrnují všechny příslušné režijní náklady splatné kterékoli Smluvní straně nebo subjektu v důsledku Klinického hodnocení nebo v souvislosti s ním. Poskytovatel bere na vědomí, že společnost Covance nenese odpovědnost za platby, dokud Zadavatel neuhradí takové platby a/nebo splatnou odměnu. Společnost Covance vyvine maximální úsilí, aby získala finanční prostředky od Zadavatele včas s cílem zajistit rychlé zaplacení Příjemci platby. (c) Platby jsou podmíněny postupem v plném souladu s CIP a touto Smlouvou, jakož i včasným a uspokojivým předložením úplných a správných údajů z formulářů subjektů hodnocení (Case Report Form). Příjemce či příjemci plateb nezískají náhradu za subjekty hodnocení, které byly do Klinického hodnocení zařazeny bez řádně provedeného (d) Except as expressly provided for in this Agreement and its exhibits and attachments, no payments will be made to Institution or any other person or entity in connection with the Clinical Investigation. Payment for any costs outside of this Agreement and its exhibits and attachments must be approved in advance in writing by Covance. (e) If a dispute arises between the Parties in respect of any part of an invoice, Covance shall notify Payee promptly of the particulars of the dispute, and Covance may withhold payment of the disputed part of the invoice provided that Covance and Payee endeavor promptly and in good faith to resolve the dispute. (f) Institution shall not bill any third party for any Clinical Investigational Device or other items or services furnished by Sponsor through Covance in connection with the Clinical Investigation, or any services provided to patients in connection with the Clinical Investigation for which payment is made as part of the Clinical Investigation, except as may be specifically authorized by the Exhibit B. 16.