Cerebral Cortex Sample Clauses

Cerebral Cortex. In press.
AutoNDA by SimpleDocs
Cerebral Cortex. 11, 2565-77. [3] Xxxxxxx, X. et al. 2010. Neuroimage. 54, 1262-1279 [4] Xxxxx, X. xx. al. 2012.
Cerebral Cortex. 18 1.1.4.4 Thalamus 19
Cerebral Cortex. Cortical expression of group III mGluR mRNA has been detected by in situ hybridization and Northern blot analyses. While group III mGluRs are widely distributed among many cortical regions, there are some cortical areas where mGluR7 mRNA is intensely or moderately expressed without any significant expression of mGluR4 mRNA. These include the neocortical regions, the cingulate, retrosplenial, piriform and perirhinal cortices, superficial layers of the subicular cortex, deep layers of the entorhinal, parasubicular, and presubicular cortices (Xxxxxxx et al., 1996; Corti et al., 2002; Kinzie et al., 1995; Ohishi et al., 1995; Okamoto et al., 1994). In the cerebral cortex, both the mGluR4 mRNA and protein has been detected using in situ, immunoblotting and mGluR4 immunoreactivity was observed in a clear laminar pattern in all deep cortical areas (layer IV/V interface) from the frontal to entorhinal cortex inclusive (Xxxxxxx et al., 1996; Xxxxxxx et al., 1994; Xxxxxxxx et al., 1997). The morphology and density of immunopositive cortical cells suggests that they are not all pyramidal output cells, but may represent a subpopulation cortical interneurons or stellate cells (Ohishi et al., 1995; Xxxxxxxx et al., 1997). Shortly after, immunohistochemical analysis by Xxxxxx et al. (2001) identified mGluR4a-positive corticostriatal projection neurons in deep cortical layers. In situ hybridization with the mGluR7 cRNA probe produced a pattern of hybridization signal identical to the distribution found in previous studies (Kinzie et al., 1995; Ohishi et al., 1995). In cerebral cortex, the labeling was most intense in the occipital cortex and slightly less intense in frontal cortical areas. Immunohistohemical analysis of cortical tissue confirmed the localization of mGluR7 in the rodent cortex (Xxxxxxxx et al., 1999). Thus it is possible that group III mGluRs are expressed in cortical interneurons and projection neurons.

Related to Cerebral Cortex

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Data Storage Where required by applicable law, Student Data shall be stored within the United States. Upon request of the LEA, Provider will provide a list of the locations where Student Data is stored.

  • Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason:

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Hospitals of Ontario Voluntary Life Insurance Plan The Hospital also agrees to make the Hospitals of Ontario Voluntary Life Insurance Plan (HOOVLIP) available to the nurses subject to the provisions of HOOVLIP at no cost to the Hospital.

  • Vyšší moc The performance by either Party of any obligation on its part to be performed hereunder shall be excused by floods, fires or any other Act of God, accidents, wars, riots, embargoes, delay of carriers, inability to obtain materials, failure of power or natural sources of supply, acts, injunctions, or restraints of government or other force majeure preventing such performance, whether similar or dissimilar to the foregoing, beyond the reasonable control of the Party bound by such obligation, provided, however, that the Party affected shall exert its reasonable efforts to eliminate or cure or overcome any of such causes and to resume performance of its obligations with all possible speed. Splnění jakékoli povinnosti kteroukoli ze Stran, jež má být takovou Stranou splněna na základě podmínek této Smlouvy, bude prominuto v důsledku záplav, požárů či jiných projevů Vyšší moci, nehod, válek, nepokojů, embarg, prodlení dopravců, nemožnosti opatřit příslušné materiály, nebude-li dodána elektrická energie či jiné přírodní zdroje, v důsledku rozhodnutí, zákazů či omezení státního/správního úřadu či jiného prvku vyšší moci, který zabrání splnění takové povinnosti, bez ohledu na to, zda je shodný či odlišný od shora uvedeného, a který stojí mimo možnost ovlivnění příslušné Strany, která je takovou povinností vázána, to však za podmínky, že takto dotčená Strana vyvine odpovídají úsilí za účelem odstranění či nápravy či překonání jakéhokoli takového důvodu či příčiny a bude pokračovat v plnění svých povinností x xxxxxxxxxx xxxxxx xxxxxxx xxxxxxxx.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

  • Safety Footwear 1. The State will provide employees in the classifications listed in Section 7 below, and employees who are currently required to wear safety footwear by Department Work Rules, an allowance of one hundred twenty dollars ($120.00) for replacement of safety footwear.

Time is Money Join Law Insider Premium to draft better contracts faster.