Cleaning of Clarifiers Sample Clauses

Cleaning of Clarifiers. (1.1.1) Ea 4
AutoNDA by SimpleDocs
Cleaning of Clarifiers.  The Contractor verifies that the relevant clarifier is drained, isolated and is made safe to work on by means of the issue and acceptance of a Permit to Work (PTW) by the Responsible Person (RP). Furthermore, the Contractor’s Authorised Supervisor (AS), as per and that all workers are signed on to the RP’s Worker’s Register.  The Contractor establishes scaffolding requirements and requests the Employer to erect scaffolding and barricading wherever necessary. Planning is required twenty four hours in advance for new scaffolding/barricading and for any modifications as well. Scaffolding and barricading cannot be erected, moved, dis-assembled or modified by the Contractor. Safety harnesses must be worn by all the Contractor’s personnel to access scaffolds via ladders and in all areas when working at heights.  The Contractor removes approximately 20m3 of sludge and debris from each clarifier The Contractor removes approximately 20m3 of sludge from each clarifier by means of hosing with water and sweeping the sludge through the clarifier drain valves that discharges into the water treatment plant effluent system.  The Contractor high pressure cleans the internal concrete walls of each clarifier.  The Contractor cleans the two vacuum blower rooms.  The Contractor disposes of all waste generated during the cleaning process according to the Employer’s waste management procedure.

Related to Cleaning of Clarifiers

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Sealing and Marking of Bids 21.1 The bidder shall seal the original and each copy of the bid in separate envelopes duly marking the envelopes “ORIGINAL” and “COPY”. The envelopes shall then be sealed in an outer separate envelope.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

Time is Money Join Law Insider Premium to draft better contracts faster.