Co-Location Equipment Installation and Maintenance Procedures. 2.1 The Operator shall install the Interconnect Equipment (listed in the form set out in Attachment C12 and provided to PMCL along with the Co-Location Request) at the Co- Location Site in accordance with the terms set out herein. 2.2 Prior to commencing installation of its Interconnect Equipment, the Operator must submit to PMCL for approval detailed installation plans and installation timetable no less than twenty- one (21) Business Days before the proposed commencement of installation. The Operator shall not commence installation of its Interconnect Equipment until it has received PMCL’s written approval. 2.3 Operator must comply with PMCL’s procedures for Co-Location Space in relation to the installation, operation and maintenance of its Interconnect Equipment located in the Co- Location Site as issued and amended from time to time by PMCL, and any written instructions, which are provided to the Operator by PMCL. 2.4 The Operator must ensure that the floor loading of its Interconnect Equipment shall be limited to the maximum specified. 2.5 The Operator must install its Interconnect Equipment in the Co-Location Space within thirty
Appears in 2 contracts
Co-Location Equipment Installation and Maintenance Procedures. 2.1 The Operator shall install the Interconnect Equipment (listed in the form set out in Attachment C12 and provided to PMCL along with the Co-Location Request) at the Co- Location Site in accordance with the terms set out herein.
2.2 Prior to commencing installation of its Interconnect Equipment, the Operator must submit to PMCL for approval detailed installation plans and installation timetable no less than twenty- one (21) Business Days before the proposed commencement of installation. The Operator shall not commence installation of its Interconnect Equipment until it has received PMCL’s written approval.
2.3 Operator must comply with PMCL’s procedures for Co-Location Space in relation to the installation, operation and maintenance of its Interconnect Equipment located in the Co- Location Site as issued and amended from time to time by PMCL, and any written instructions, which are provided to the Operator by PMCL.
2.4 The Operator must ensure that the floor loading of its Interconnect Equipment shall be limited to the maximum specified.
2.5 The Operator must install its Interconnect Equipment in the Co-Location Space within thirty