Compressed Air Engine Model Sample Clauses

Compressed Air Engine Model. The compressed air engine is an air driven machine, such as a gas driven turbine. This can be connected to a generator to produce electrical power. As shown above the power generated by the turbine is dependent on the air feed pressure, temperature and flow rate. Figure 62 shows the model block of the compressed air engine that was created in GES. Figure 62: Compressed air engine model block Table 40 gives the input and outputs parameters needed to define the compressed air engine model in GES. Type Version INOMAN.1 Help Compressed air Created Name Gates AIR_Compresse air storage 1 Fuel type SWBS 0 0 TNO 5-11-2013 Parameters 0 gate # Index Power [In,Out] effort cal unit flow cal unit parameter # name value unit
AutoNDA by SimpleDocs

Related to Compressed Air Engine Model

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Engine A. Any internal repairs or replacement of internal components, or replacement of engine assembly.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Model List your model number of the product you are bidding.

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

Time is Money Join Law Insider Premium to draft better contracts faster.