Concessionaire Requests for Deviations from Technical Requirements Sample Clauses

Concessionaire Requests for Deviations from Technical Requirements. (a) The status of Deviations submitted to the Department as of the Agreement Date shall be set forth in the Technical Requirements.
AutoNDA by SimpleDocs
Concessionaire Requests for Deviations from Technical Requirements. (a) The Concessionaire may request the Department to approve Deviations by submitting to the Department a written change request in a form approved by the Department. At a minimum, the following information shall be submitted with each such change request: (i) a statement that the request is submitted pursuant to this Section; (ii) a statement concerning the basis for the request, benefits to the Department and an itemization of the contract items and requirements affected by the request; (iii) a detailed estimate of the time and/or cost savings and impacts on Gross Revenues; (iv) proposed specifications and recommendations as to the manner in which the requested changes are to be accomplished; and (v) the time by which the request must be approved so as to obtain the maximum cost-effectiveness. The Department may consider and approve or disapprove, in its sole discretion, any such request, and the Concessionaire shall bear the burden of persuading the Department that the Deviation sought constitutes sound and safe engineering consistent with Good Industry Practice and achieves the Department’s applicable safety standards and criteria. No Deviation shall exist or be effective unless and until approval thereof is expressly provided in writing by the Department. Approval of a submission containing a Deviation shall not constitute approval of the Deviation unless and until the Department expressly and specifically approves the Deviation in writing pursuant to the terms of this Section 8.10(a). The Department’s decision shall not be subject to the dispute resolution procedures of Section 22.01.

Related to Concessionaire Requests for Deviations from Technical Requirements

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Minimum Technical Requirements Participant will be responsible for installing (unless Vendor provides), maintaining and hosting the Vendor’s integration package (either “Full Express” or “Express Lite” software) on Participant’s own computer to enable connectivity to the Network for the Patient Look-Up and Delivery Services including installing and maintaining updates and upgrades. Participant’s machine must meet the following requirements for hosting the Vendor’s integration package: • A virtual machine environment running VMware Player (free open source product) that can run the Express VMware disk image (.ova format) • For Vendor’s “Express Lite” software (for Participants that already have an enterprise master patient index (MPI) and a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 4 CPU cores o 8GB of RAM o 100GB of available disk space • For Vendor’s “Full Express” software (for Participants that do not already have an MPI or a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 8 CPU cores o 16GB of RAM o 500GB of available disk space • Network access between the Vendor’s Express software (either “Express Lite” or “Full Express”) and the Participant’s health information exchange system for the exchange of clinical system data for the Patient Look-Up and Delivery Services. The Participant shall maintain availability of its data for query on a 24 hour/7 day basis with the exception of routine and unexpected maintenance, at greater than 99% uptime monthly. The Participant shall make its data available for a minimum look-back period of 18 months up to and including current available data and update the available data daily.

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Agreement and the Regulations relative to non-discrimination on the grounds of race, color, or national origin.

  • Technical Requirements 2.7.4.1 The NID shall provide an accessible point of interconnection and shall maintain a connection to ground.

  • Solicitations for Subcontractors, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin, sex, age, and disability/handicap.

  • CONTRACTOR’S SUBMISSION OF CONTRACT MODIFICATIONS In connection with any Contract modification, OGS reserves the right to:  request additional information  reject Contract modifications  remove Products from Contract modification requests  request additional discounts for new or existing Products

  • Solicitations for Subcontracts, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Time is Money Join Law Insider Premium to draft better contracts faster.