CONCRETE CHANNEL CLEANOUT Sample Clauses

CONCRETE CHANNEL CLEANOUT. Debris, sediment and vegetation from concrete channels are removed on a monthly basis to maintain conveyance capacities and vector control. There are approximately 4,000 cubic yards (cy) of debris, sediment, and vegetation that need to be removed from Corps-maintained concrete channels. Approximately 100 cy of debris are removed monthly from concrete channels using grapple trucks, rubber-tired dump trucks with a grapple arm attachment. The use of grapple trucks eliminates the need for temporary stockpiles in aquatic areas. However, backhoes or loaders working in a channel in combination with dump trucks may be utilized as needed. Equipment would enter the channel via existing access ramps.
AutoNDA by SimpleDocs

Related to CONCRETE CHANNEL CLEANOUT

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Rippable Rock Rippable rock is defined as any material that can be ripped with a single-tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term.

  • Mobility 7.1 There may also be a business need to travel and work on a temporary basis at any premises which the Corporation currently has or may subsequently acquire or at any premises at which it may from time to time provide services. This would be subject to discussion and agreement giving due regard to the following considerations: - The location and arrangements for travel and subsistence; - The length of the working day with increased travel time; - The hours of work; - The timescale and duration of the proposed arrangements; - The employee’s personal and family circumstances.

  • CFR 200 328. Failure to submit such required Performance Reports may cause a delay or suspension of funding. 30 ILCS 705/1 et seq.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48  See Figure 1 for required compliance  Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

Time is Money Join Law Insider Premium to draft better contracts faster.