Construction and Operation Phases. 3.7.2.1 Based on the findings of site appraisal (i.e. desktop study and site inspection) within the site boundaries of construction works, no potentially contaminating activities were identified. Therefore, adverse land contamination impact arising from the Project would not be anticipated.
AutoNDA by SimpleDocs
Construction and Operation Phases. 3.8.2.1 Literature review and ecological field surveys have been conducted. Eight terrestrial habitats were identified within the study area including mixed woodland, plantation, shrubland, grassland, developed area, natural watercourse, intertidal habitat and drainage channel. Marine habitats within the study area include subtidal hard substrate and soft bottom habitats, and intertidal habitats (i.e. rocky shore, xxxxx xxxxx and artificial seawall). The ecological values of the identified habitats are rated as low or low to moderate. No sites of conservation importance would be directly affected.

Related to Construction and Operation Phases

  • Application and Operation Subject Matter Clause No.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Construction Phase Part 1 –

  • Variation and Operation Pursuant to and subject to clause 5 of the State Agreement the parties agree to amend the State Agreement in the manner set out in this Agreement.

  • Management and Operations 15.1 The Operator shall prepare an annual work programme and budget for each Calendar Year during the term of this Agreement. Each such work programme and budget shall set out in reasonable details, the work to be carried out, facilities to be purchased or created, training and employment programme, establishment, salaries and wages, social welfare schemes to be undertaken, and an estimate of the Expenditure to be incurred. The Operator shall present such work programme and budget to the Government and the Working Interest Owners before the start of each Calendar Year and thereafter provide a quarterly update on the implementation of such work programme and budget.

  • Use and Operation 3.1 Permitted Use ......................................................................................................

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Post-Construction Phase A. Upon written authorization from Owner during the Post-Construction Phase, Engineer shall: