Contingency Alert Sample Clauses

Contingency Alert. CLIN is priced as a NOT-TO-EXCEED amount which the Contractor shall not exceed without the Contracting Officer's prior concurrence. The intent of this provision is to fairly compensate for services performed
AutoNDA by SimpleDocs
Contingency Alert. Contractor shall submit a SF 1113 (or similar form) directly to the ACO located at HQ AMC/DOYMA, 000 Xxxxx Xx, Xxxx 0X0, Xxxxx XXX IL 62225-5302. Attach to the invoice complete documentation to support costs incurred in performance of contingency alert services. (See Section B, CLIN 0002 and Section B, para 2.d.)
Contingency Alert. CLIN is priced as a NOT-TO-EXCEED amount which the Contractor shall not exceed without the Contracting Officer's prior concurrence. The intent of this provision is to fairly compensate for services performed which will not be compensated through the award of a mission. The Contractor shall submit complete documentation to support all costs identified on their invoice for services performed. The Contracting Officer will evaluate the Contractor's submission for reasonableness, allowability, and allocability consistent with the Federal Acquisition Regulation and negotiate with the Contractor as needed. Potential loss of revenue from commercial business is not an allowable cost. (See Section B, CLIN 0002, Section 4, para 4.28 of Section C, PWS.)

Related to Contingency Alert

  • Emergency Repairs In the event Emergency Repairs are needed at the Hotels, Manager shall be required to use its good faith efforts to obtain Lessee’s verbal approval of any Emergency Repairs prior to making any expenditure therefor. In the event Manager is unable to contact Lessee to obtain its verbal approval of Emergency Repairs, then Manager is authorized to enter into contracts occasioned by such emergency that provide for expenditures not contemplated by the Annual Business Plan up to a sum of $50,000, and provided the same may be incurred under the Loan Documents. Manager will promptly give Lessee written notice of any Emergency Repairs made by Manager.

  • Engines POSITION SERIAL NO. TOTAL HOURS TOTAL CYCLES HRS/CYCLES SINCE LAST SHOP VISIT Time Remaining to Next LIFE LIMITED PART REMOVAL PART NAME HOURS CYCLES MSN MSN

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Emergency Services HMO policy and procedures, Covered Services, claims adjudication methodology, and reimbursement performance for Emergency Services must comply with all applicable state and federal laws, rules, and regulations including 42 C.F.R. §438.114, whether the provider is in-network or Out-of-Network. HMO policies and procedures must be consistent with the prudent layperson definition of an Emergency Medical Condition and the claims adjudication processes required under the Contract and 42 C.F.R. §438.114. The HMO must pay for the professional, facility, and ancillary services that are Medically Necessary to perform the medical screening examination and stabilization of a Member presenting with an Emergency Medical Condition or an Emergency Behavioral Health Condition to the hospital emergency department, 24 hours a day, 7 days a week, rendered by either the HMO's Network or Out-of-Network providers. The HMO cannot require prior authorization as a condition for payment for an Emergency Medical Condition, an Emergency Behavioral Health Condition, or labor and delivery. The HMO cannot limit what constitutes an Emergency Medical Condition on the basis of lists of diagnoses or symptoms. The HMO cannot refuse to cover Emergency Services based on the emergency room provider, hospital, or fiscal agent not notifying the Member’s PCP or the HMO of the Member’s screening and treatment within 10 calendar days of presentation for Emergency Services. The HMO may not hold the Member who has an Emergency Medical Condition liable for payment of subsequent screening and treatment needed to diagnose the specific condition or stabilize the patient. The HMO must accept the emergency physician or provider’s determination of when the Member is sufficiently stabilized for transfer or discharge.

  • HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.

  • Liquidity Risk Measurement Services Not Applicable.

  • Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.

  • FIRE AND CASUALTY DAMAGE A. Landlord agrees to maintain Causes of Loss-Special Form property insurance covering the building of which the premises are a part in an amount not less than ninety percent (90%) (or such greater percentage as may be necessary to avoid the application of any co-insurance clauses of the policy) of the full replacement cost thereof. Subject to the provisions of subparagraphs 12C, 12D, and 12F below, such insurance shall be for the sole benefit of Landlord and under its sole control. If during the calendar year following the calendar year in which the commencement date of this lease falls, or during any subsequent year of the primary term or any renewal or extension, Landlord’s cost of maintaining such insurance on an annual basis shall exceed Three Thousand Three Hundred Thirty-Six and 21/100 Dollars ($3,336.21) Landlord’s cost of maintaining such insurance for the calendar year, Tenant agrees to pay to Landlord, as additional rental, Tenant’s full proportionate share (as defined in subparagraph 24J) of such excess. Said payments shall be made to Landlord within ten (10) days after presentation to Tenant of Landlord’s statement setting forth the amount due, and the failure to pay such excess shall be treated in the same manner as a default in the payment of rent hereunder when due. Any payment to be made pursuant to this subparagraph 12A with respect to the year in which this lease commences or terminates shall bear the same ratio to the payment which would be required to be made for the full year as the part of such year covered by the term of this lease bears to a full year. Tenant shall not take out separate insurance concurrent in form or contributing in the event of loss with that required to be maintained by Landlord hereunder unless Landlord is included as an additional insured thereon. Tenant shall immediately notify Landlord whenever any such separate insurance is taken out and shall promptly deliver to Landlord the policy or policies of such insurance.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

Time is Money Join Law Insider Premium to draft better contracts faster.