Cool Roofs Sample Clauses

Cool Roofs. ‌ DOE’s Roof Asset Management Program (RAMP) manages roofing assets across the DOE Complex. The RAMP is a subset of the Facilities and Infrastructure Recapitalization Program (FIRP).
AutoNDA by SimpleDocs

Related to Cool Roofs

  • 000 TOOL ROOMS 24.100 The Company and the Unions agree that it shall be the Owner's prerogative to maintain and operate a general centrally located tool room and warehouse. The Unions agree that the manpower required for the operation of the centrally located tool room and warehouse may at the Owner's option be employed directly by them.

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • Scaffolding The Landlord must ensure that any scaffolding erected outside the Premises in exercise of the Landlord's rights under this Lease: is not erected or retained (unless in an emergency) during the months of January, November and December or during the one week period either side of Easter Sunday, in each year; is removed as soon as reasonably practicable, with any damage caused to the exterior of the Premises made good; causes as little obstruction as is reasonably practicable to the entrances to the Premises and the Centre; and does not have advertising displayed on it (except for any health and safety notices and signs relating to any other tenant whose premises are obstructed or interfered with by the scaffolding) unless the Tenant has consented to its display. If the Tenant's sign and fascia or display window is obstructed or interfered with by the scaffolding, the Landlord will permit the Tenant to display a sign (approved by the Landlord) on the exterior of the scaffolding in front of the Premises so that it is visible to the public. [Turnover Information The Landlord will only use any information provided to the Landlord under Clause 4.24 for management purposes in connection with the monitoring and assessment of sales at and the performance of the Centre. The Landlord may disclose it to the following people on the terms of Clause 5.7.2: the Landlord's advisors and funders; any party (and their advisors and funders) interested in acquiring the Landlord's interest in the Centre; where required by law; and where required by the rules of any listing authority. Where the Landlord is allowed to disclose the information to someone else under this Clause 5.7, the Landlord will stress its confidential nature.] Change in the extent of the Centre The Landlord may change the extent of the Centre but any changes must not: materially increase the amount of Service Charge payable by the Tenant; or materially prejudice: the Tenant's use and occupation of the Premises; or the rights, facilities and amenities granted to the Tenant under this Lease.

  • Doors Exterior doors may not be propped open for safety and security reasons. Students may be referred to the student conduct system if found propping these doors. Doors marked as emergency exits may only be used for emergency purposes other than during University-sanctioned move-in days.

  • Locks 1) The landlord must not change locks or other means of access to residential property unless the landlord provides each tenant with new keys or other means of access to the residential property.

  • Retaining Walls Prepare preliminary retaining concepts to be shown on schematics, typical sections, and cross sections. • Determine if any additional walls are required and verify the need for and length of the retaining wall as shown on the ultimate schematic. • Compute and tabulate retaining wall quantities for preliminary design milestone plans submittal.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Driveways 2.8 The Shop Response must include the possible impact description as well as a timeframe for restoration of Utility or work area. End users and O&M must be made aware of the possible impact in case of failure of redundant system/equipment. End user(s) and O&M must have some say of the date and time it may take place.

Time is Money Join Law Insider Premium to draft better contracts faster.