Copies of Construction Documents Sample Clauses

Copies of Construction Documents. The Architect shall furnish copies of all Construction Documents upon the written request of the Owner. The Owner shall reimburse the Architect at the cost of reproduction if in excess of the number specified in Section VII hereof.
AutoNDA by SimpleDocs
Copies of Construction Documents. The Consultant shall furnish copies of all Construction Documents to the Owner upon written request, for which the Owner will reimburse the Consultant at the cost of reproduction if in excess of the number specified in Section I.D.
Copies of Construction Documents. The Design Professional shall furnish hard copies of all Construction Documents upon the written request of the Owner. The Owner shall reimburse the Design Professional at the actual cost of reproduction.
Copies of Construction Documents. The Architect shall furnish copies of all Construction SAMPLE
Copies of Construction Documents. Professional shall furnish Contractor with electronic Construction Documents. Any printed copies of Construction Documents, required by Contractor for bidding or execution of the Work, shall be made by Contractor from its electronic set at Contractor’s sole cost and expense. Professional is furnishing Contractor an electronic set of Construction Documents for Contractor’s convenience and such furnishing by Professional shall not be deemed to be a waiver by Owner or Professional of any copyright, patent or license they may have with respect to the Construction Documents. All such copyrights, patents and licenses hereby being expressly reserved by Owner and Professional.

Related to Copies of Construction Documents

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • Inspection of construction records The Authority shall have the right to inspect the records of the Contractor relating to the Works.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.