Course timetabling Sample Clauses

Course timetabling. 8.6.1 Timetable planning will ensure that the principles of transparency, fairness and equity are respected.
AutoNDA by SimpleDocs

Related to Course timetabling

  • Construction Progress Meetings The Design Professional shall attend Construction Progress Meetings periodically held by the Contractor at the Site on a schedule determined by the Contractor. The Design Professional shall review the minutes of the meeting and provide his written comments to the minutes to the Owner and Contractor within seven calendar days after receipt of the meeting minutes.

  • DISASTER RECOVERY AND BUSINESS CONTINUITY The Parties shall comply with the provisions of Schedule 5 (Disaster Recovery and Business Continuity).

  • Timetable In order to set a timetable and procedural framework within which the subcommittees will accomplish their tasks, the parties have further agreed to the following: The subcommittees referenced in Section 1 above will be appointed and have their first organizational meeting within six (6) weeks of the date of the MOU ratification. Each subcommittee shall provide to the Head of the affected Department a final report no later than thirty (30) weeks after the date of the MOU ratification. The Department Head who receives a final report will meet with the LMC to provide feedback on the report, indicating areas of acceptance and explaining the reasons for rejecting any of the recommendations in the report.

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

  • Pre-Operations Meeting PURCHASER shall meet with STATE no later than 30 days from execution of the contract to discuss the Threatened and Endangered Species survey, protection, and planning requirements. Operations Plan. PURCHASER shall prepare an Operations Plan for all operations to be conducted under this contract and submit the plan to STATE at least 5 calendar days prior to commencement of any operation. This plan shall be prepared on a form provided by STATE, and shall be used for all types of operations, including road maintenance, project work, logging, and postharvest requirements. STATE may require an on-site meeting prior to approval of the plan, attended by PURCHASER, subcontractor, and STATE representatives. STATE's approval of the plan must be obtained prior to commencement of any operation, and PURCHASER must comply with this plan. If PURCHASER fails to comply with any of the terms of the plan, including completion dates, STATE may, after giving written notice, suspend PURCHASER's operations until such time as an acceptable alternate plan is submitted by PURCHASER and that alternate plan is accepted by STATE, as provided in Section 29, "Violations, Suspensions, and Cancellation." PURCHASER shall notify STATE whenever operations will be inactive for more than 3 days, and again when operations will be resumed. Upon approval by STATE, the Operations Plan shall automatically be incorporated into, and made part of, this contract. PURCHASER's strict compliance with the Operations Plan, as approved by STATE, is a material condition and covenant of this contract. STATE has prepared the required Forest Practices Act (FPA) "Written Plan" for operations within 100 feet of Type F or Type D streams. Any changes to the plan must have STATE approval. PURCHASER shall comply with all provisions of the Written Plan. Seasonal Restrictions. PURCHASER shall adhere to the following restrictions, unless otherwise approved in writing by STATE:

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Project Managers; Meetings 10.1 Promptly following the Effective Date, each Party shall designate a Project Manager responsible for coordinating the Party’s Work and shall provide the other Party with a written notice containing the name and contact information of such Project Manager (“Project Manager”). In no event shall any Project Manager be authorized to amend or modify the provisions of this Agreement. Each Party may change its Project Manager, from time to time, by written notice to the other Party.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

Time is Money Join Law Insider Premium to draft better contracts faster.