Covered Service Component Sample Clauses

Covered Service Component. Non-Emergent Medical Transportation (NEMT)
AutoNDA by SimpleDocs
Covered Service Component. Medication Management‌
Covered Service Component. Non-Emergent Medical Transportation (NEMT) 24 6. Covered Service Components: Preventive Care, Family Planning, Sterilizations & Hysterectomies and Post Hospital Extended Care 33 7. Covered Service Components: Medication Management 35 8. Covered Service Components: Other Services 37 9. Non-Covered Health Services with Care Coordination 3139 610. Non-Covered Health Services without Care Coordination 3240 Exhibit BStatement of Work - Part 3 –- Patient Rights and Responsibilities, Engagement and Choice 3341
Covered Service Component. Crisis, Urgent and Emergency Services The terms and conditions of Section 4, Exhibit B, Part 2 in the Medicaid Contract are incorporated by reference and have the same force and effect as though they are fully set forth herein.

Related to Covered Service Component

  • Provider Selection To the extent applicable to Provider in performance of the Agreement, Provider shall comply with 42 CFR 438.214, as may be amended from time to time, which includes, but is not limited to the selection and retention of providers, credentialing and recredentialing requirements and nondiscrimination. If Subcontractor and/or Health Plan delegate credentialing to Provider, Subcontractor and/or Health Plan will provide monitoring and oversight and Provider shall ensure that all licensed medical professionals are credentialed in accordance with Health Plan’s and the State Contract’s credentialing requirements.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Third Party Components The Products and Services may contain third party components (including open source software) subject to separate license agreements. To the limited extent a third party license expressly supersedes this XXXX, such third party license governs Customer’s use of that third party component.

Time is Money Join Law Insider Premium to draft better contracts faster.