CPI Rate Adjustments. Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. EXHIBIT D - RATE SCHEDULE Corridor E Corsair CATEGORY RATE Principal $271.00 Senior Project Manager $271.00 Project Manager $240.87 Senior Engineer $180.66 Project Engineer $165.59 Design Engineer $143.01 Engineer In Training $105.37 Senior Engineer Tech $82.80 Engineer Tech $46.97 Admin/Clerical $72.28 DIRECT EXPENSES Mobilization and Demobilization (LS) $500 Support Vehicle (per day) $250 Soil Drilling and Sampling (Cohesive soils): Continuous in the upper 10 ft and at 5ft intervals thereafter. Spt samples in granular soils. (per foot) $28 Rock Coring (per foot) $42 TCP Tests (at 5ft intervals) (ea) $15 Backfill with soil cuttings/grouting with Bentonite chips (per foot) $8 Per Diem (each 2-person drilling crew) Per Vendor Reimbursement Policy Moisture Content (ASTM D2216) ea $10 Atterberg Limits (ASTM 4318) ea $80 Percent Passing No. 200 Sieve (ASTM D1140) ea $45 Sieve Analysis (ASTM D4222) ea $95 Unconfined Compressive - Soil (ASTM D2166) ea $70 Unconfined Compressive - Rock (ASTM 7012) ea $75 Consolidated - Undrained Compression Test with Pore Pressure, Muliti-sample, 3 per failure envelope (includes DUW & Stress- Strain Curves) ASTM4767 ea $1600 Consolidation, Incremental Loading (ASTM 2435) ea $500 Corrosion Suite (Sulfates, Chlorides, and PH) ea $175 Resilent Modulus (RM), Minimum of 4 tests ea $650x4 = $2600 Standard Xxxxxxx (ASTM 698) ea $250 Utility Locates (per boring) ea $25 Traffic Control (per boring) ea $2800 Sample Storage (per month) $500 CPI Rate Adjustments: Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. E XHIBIT D - RATE SCHEDULE CORRIDOR E INLAND GEODETICS, LLC CATEGORY RATE PROJECT MANAGER $169.71 LICENSED STATE LAND SURVEYOR $161.81 REGISTERED PROFESSIONAL LAND SURVEYOR $165.76 SURVEY TECHNICIAN $119019 CLERICAL SUPPORT $68.41 2-PERSON SURVEY CREW $150.00 3-PERSON SURVEY CREW $170.00 4-PERSON SURVEY CREW $190.00 ADDITIONAL CREW MEMBER $54.00 DIRECT EXPENSES GPS FIELD OPERATOR & VEHICLE & GPS RECEIVER $120.00 ALL TERRAIN VEHICLE (PER DAY) $55.00 ADDITONAL VEHICLE (PER DAY) $60.00
Appears in 1 contract
Samples: Williamson County
CPI Rate Adjustments. Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. EXHIBIT D - RATE SCHEDULE Corridor E Corsair CR 404 Realignment AmaTerra Environmental, Inc. CATEGORY RATE Principal $271.00 226.50 Team Leader / Office Leader $132.10 Senior Project Manager $271.00 125.34 Project Manager $240.87 Senior Engineer 111.18 Project Accountant $180.66 101.60 Project Engineer Administrator $165.59 Design Engineer 80.32 Administrative Assistant $143.01 Engineer In Training 79.06 Historical Architect/Historian IV $105.37 Senior Engineer Tech 128.69 Architectural Historian/Historian III $82.80 Engineer Tech 107.05 Architectural Historian/Historian II $46.97 Admin80.32 Architectural Historian/Clerical Historian I $72.28 61.26 Archeologist VI/Sr Principal Investigator $113.15 Archeologist V/Jr. PI $88.04 Archeologist IV/Project Archeologist $72.11 Archeologist III/Field Director $71.39 Archeologist II/Crew Chief $63.75 Archeologist I/Technician $57.21 GIS Specialist $89.52 GIS Technician/Illustrator/Drafter $68.49 Document Production Spvr $79.06 Editor $70.80 DIRECT EXPENSES Mobilization and Demobilization Photocopies B/W (LS8.5x11) (produced In-house) $500 Support Vehicle 0.10 Per Sheet Photocopies B/W (per day11x17) (produced In-house) $250 Soil Drilling and Sampling 0.10 Per Sheet Photocopies Color (Cohesive soils): Continuous in the upper 10 ft and at 5ft intervals thereafter. Spt samples in granular soils. 8.5x11) (per footproduced In-house) $28 Rock Coring 1.00 Per Sheet Photocopies Color (per foot11x17) (produced In-house) $42 TCP Tests 1.00 Per Sheet Archeological Site Fee * $96.00 per site Curation: Records* $455.00 per 1.5 linear inches Curation: Artifacts* $1,172.50 per box (0.5 cu ft) GPS Rental $50.00 per day Trimble Rental $150.00 per day Backhoe rental w/ operator $1,500 per day Field supplies $50 per unit *NOTE: These are fees set by the Texas Archeological Research Lab (TARL) at 5ft intervals) (ea) $15 Backfill the University of Texas and are 100% pass-through costs with soil cuttings/grouting with Bentonite chips (per foot) $8 Per Diem (each 2-person drilling crew) Per Vendor Reimbursement Policy Moisture Content (ASTM D2216) ea $10 Atterberg Limits (ASTM 4318) ea $80 Percent Passing Nono markup. 200 Sieve (ASTM D1140) ea $45 Sieve Analysis (ASTM D4222) ea $95 Unconfined Compressive - Soil (ASTM D2166) ea $70 Unconfined Compressive - Rock (ASTM 7012) ea $75 Consolidated - Undrained Compression Test with Pore Pressure, Muliti-sample, 3 per failure envelope (includes DUW & Stress- Strain Curves) ASTM4767 ea $1600 Consolidation, Incremental Loading (ASTM 2435) ea $500 Corrosion Suite (Sulfates, Chlorides, and PH) ea $175 Resilent Modulus (RM), Minimum of 4 tests ea $650x4 = $2600 Standard Xxxxxxx (ASTM 698) ea $250 Utility Locates (per boring) ea $25 Traffic Control (per boring) ea $2800 Sample Storage (per month) $500 CPI Rate Adjustments: Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment Expenses will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made reimbursed based on Exhibit E – Vendor reimbursement policy in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. E XHIBIT D - RATE SCHEDULE CORRIDOR E INLAND GEODETICS, LLC CATEGORY RATE PROJECT MANAGER $169.71 LICENSED STATE LAND SURVEYOR $161.81 REGISTERED PROFESSIONAL LAND SURVEYOR $165.76 SURVEY TECHNICIAN $119019 CLERICAL SUPPORT $68.41 2-PERSON SURVEY CREW $150.00 3-PERSON SURVEY CREW $170.00 4-PERSON SURVEY CREW $190.00 ADDITIONAL CREW MEMBER $54.00 DIRECT EXPENSES GPS FIELD OPERATOR & VEHICLE & GPS RECEIVER $120.00 ALL TERRAIN VEHICLE (PER DAY) $55.00 ADDITONAL VEHICLE (PER DAY) $60.00contract.
Appears in 1 contract
Samples: agenda.wilco.org
CPI Rate Adjustments. Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. EXHIBIT D - XXX, LLC RATE SCHEDULE Corridor E Corsair CATEGORY RATE November 18, 2020 SURVEYING SERVICES: Principal $271.00 215.00 per hour RPLS Project Manager $175.00 per hour RPLS Task Leader $158.00 per hour Senior Survey Technician $110.00 per hour Survey Technician $98.00 per hour 2-Person Survey Crew $155.00 per hour 3-Person Survey Crew $195.00 per hour Administration / Clerical Support $68.00 per hour SURVEY EQUIPMENT: GPS Receiver $25.00 per hour ATV or Utility Vehicle $75.00 per day Terrestrial Laser Scanner $50.00 per hour SURVEY OTHER DIRECT COSTS: Ground Target (Includes paint, panel material, etc) $25.00 each Primary Control Monument materials/supplies $90.00 each GEOSPATIAL SERVICES: Principal $215.00 per hour Senior Project Manager $271.00 205.00 per hour Project / Acquisition Manager $240.87 Senior Engineer 175.00 per hour Pilot $180.66 Project Engineer $165.59 Design Engineer $143.01 Engineer In Training $105.37 Senior Engineer Tech $82.80 Engineer Tech $46.97 Admin/Clerical $72.28 DIRECT EXPENSES Mobilization and Demobilization (LS) $500 Support Vehicle (130.00 per day) $250 Soil Drilling and Sampling (Cohesive soils): Continuous in the upper 10 ft and at 5ft intervals thereafter. Spt samples in granular soils. (per foot) $28 Rock Coring (per foot) $42 TCP Tests (at 5ft intervals) (ea) $15 Backfill with soil cuttings/grouting with Bentonite chips (per foot) $8 Per Diem (each 2-person drilling crew) Per Vendor Reimbursement Policy Moisture Content (ASTM D2216) ea $10 Atterberg Limits (ASTM 4318) ea $80 Percent Passing No. 200 Sieve (ASTM D1140) ea $45 Sieve Analysis (ASTM D4222) ea $95 Unconfined Compressive - Soil (ASTM D2166) ea $70 Unconfined Compressive - Rock (ASTM 7012) ea $75 Consolidated - Undrained Compression Test with Pore Pressure, Muliti-sample, 3 per failure envelope (includes DUW & Stress- Strain Curves) ASTM4767 ea $1600 Consolidation, Incremental Loading (ASTM 2435) ea $500 Corrosion Suite (Sulfates, Chlorides, and PH) ea $175 Resilent Modulus (RM), Minimum of 4 tests ea $650x4 = $2600 Standard Xxxxxxx (ASTM 698) ea $250 Utility Locates (per boring) ea $25 Traffic Control (per boring) ea $2800 Sample Storage (per month) $500 CPI Rate Adjustments: Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. E XHIBIT D - RATE SCHEDULE CORRIDOR E INLAND GEODETICS, LLC CATEGORY RATE PROJECT MANAGER $169.71 LICENSED STATE LAND SURVEYOR $161.81 REGISTERED PROFESSIONAL LAND SURVEYOR $165.76 SURVEY TECHNICIAN $119019 CLERICAL SUPPORT $68.41 2-PERSON SURVEY CREW $150.00 3-PERSON SURVEY CREW $170.00 4-PERSON SURVEY CREW $190.00 ADDITIONAL CREW MEMBER $54.00 DIRECT EXPENSES GPS FIELD OPERATOR & VEHICLE & GPS RECEIVER $120.00 ALL TERRAIN VEHICLE (PER DAY) $55.00 ADDITONAL VEHICLE (PER DAY) $60.00hour
Appears in 1 contract
Samples: Williamson County
CPI Rate Adjustments. Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. EXHIBIT D - RATE SCHEDULE Corridor E Corsair CR 404 Realignment Surveying And Mapping, LLC CATEGORY RATE Principal $271.00 215.00 RPLS Project Manager $175.00 RPLS Task Leader $158.00 Senior Survey Technician $110.00 Survey Technician $98.00 2-Person Survey Crew $155.00 3-Person Survey Crew $195.00 Administration/Clerical Support $70.00 Senior Project Manager $271.00 Project Manager $240.87 Senior Engineer $180.66 Project Engineer $165.59 Design Engineer $143.01 Engineer In Training $105.37 Senior Engineer Tech $82.80 Engineer Tech $46.97 Admin/Clerical $72.28 DIRECT EXPENSES Mobilization and Demobilization (LSGeospatial) $500 Support Vehicle 205.00 Project/Acquisition Manager (per dayGeospatial) $250 Soil Drilling and Sampling (Cohesive soils): Continuous in the upper 10 ft and at 5ft intervals thereafter. Spt samples in granular soils. (per foot) 175.00 Pilot $28 Rock Coring (per foot) $42 TCP Tests (at 5ft intervals) (ea) $15 Backfill with soil cuttings/grouting with Bentonite chips (per foot) $8 Per Diem (each 2-person drilling crew) Per Vendor Reimbursement Policy Moisture Content (ASTM D2216) ea $10 Atterberg Limits (ASTM 4318) ea $80 Percent Passing No. 200 Sieve (ASTM D1140) ea $45 Sieve Analysis (ASTM D4222) ea $95 Unconfined Compressive - Soil (ASTM D2166) ea $70 Unconfined Compressive - Rock (ASTM 7012) ea $75 Consolidated - Undrained Compression Test with Pore Pressure, Muliti-sample, 3 per failure envelope (includes DUW & Stress- Strain Curves) ASTM4767 ea $1600 Consolidation, Incremental Loading (ASTM 2435) ea $500 Corrosion Suite (Sulfates, Chlorides, and PH) ea $175 Resilent Modulus (RM), Minimum of 4 tests ea $650x4 = $2600 Standard Xxxxxxx (ASTM 698) ea $250 Utility Locates (per boring) ea $25 Traffic Control (per boring) ea $2800 Sample Storage (per month) $500 CPI Rate Adjustments: Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. E XHIBIT D - RATE SCHEDULE CORRIDOR E INLAND GEODETICS, LLC CATEGORY RATE PROJECT MANAGER $169.71 LICENSED STATE LAND SURVEYOR $161.81 REGISTERED PROFESSIONAL LAND SURVEYOR $165.76 SURVEY TECHNICIAN $119019 CLERICAL SUPPORT $68.41 2-PERSON SURVEY CREW $150.00 3-PERSON SURVEY CREW $170.00 4-PERSON SURVEY CREW $190.00 ADDITIONAL CREW MEMBER $54.00 DIRECT EXPENSES GPS FIELD OPERATOR & VEHICLE & GPS RECEIVER $120.00 ALL TERRAIN VEHICLE (PER DAY) $55.00 ADDITONAL VEHICLE (PER DAY) $60.00130.00
Appears in 1 contract
Samples: agenda.wilco.org
CPI Rate Adjustments. Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. EXHIBIT D - RATE SCHEDULE Xxxxxxxx Corridor E Corsair – Segment 2 SWCA CATEGORY RATE Principal Subject Matter Expert IV $271.00 Senior Project Manager 275.00 Subject Matter Expert III $271.00 Project Manager 250.00 Subject Matter Expert II $240.87 Senior Engineer 225.00 Subject Matter Expert I $180.66 Project Engineer 215.00 Specialist XIV $165.59 Design Engineer 225.00 Specialist XIII $143.01 Engineer In Training 215.00 Specialist XII $105.37 Senior Engineer Tech 211.00 Specialist XI $82.80 Engineer Tech 193.00 Specialist X $46.97 Admin/Clerical 176.00 Specialist IX $72.28 DIRECT EXPENSES Mobilization and Demobilization (LS) 158.00 Specialist VIII $500 Support Vehicle (per day) 147.00 Specialist VII $250 Soil Drilling and Sampling (Cohesive soils): Continuous in the upper 10 ft and at 5ft intervals thereafter. Spt samples in granular soils. (per foot) 137.00 Specialist VI $28 Rock Coring (per foot) 127.00 Specialist V $42 TCP Tests (at 5ft intervals) (ea) 115.00 Specialist IV $15 Backfill with soil cuttings/grouting with Bentonite chips (per foot) 105.00 Specialist III $8 Per Diem (each 2-person drilling crew) Per Vendor Reimbursement Policy Moisture Content (ASTM D2216) ea 95.00 Specialist II $10 Atterberg Limits (ASTM 4318) ea 83.00 Specialist I $80 Percent Passing No. 200 Sieve (ASTM D1140) ea 71.00 Technician II $45 Sieve Analysis (ASTM D4222) ea 59.00 Technician I $95 Unconfined Compressive - Soil (ASTM D2166) ea $70 Unconfined Compressive - Rock (ASTM 7012) ea $75 Consolidated - Undrained Compression Test with Pore Pressure, Muliti-sample, 3 per failure envelope (includes DUW & Stress- Strain Curves) ASTM4767 ea $1600 Consolidation, Incremental Loading (ASTM 2435) ea $500 Corrosion Suite (Sulfates, Chlorides, and PH) ea $175 Resilent Modulus (RM), Minimum of 4 tests ea $650x4 = $2600 Standard Xxxxxxx (ASTM 698) ea $250 Utility Locates (per boring) ea $25 Traffic Control (per boring) ea $2800 Sample Storage (per month) $500 CPI Rate Adjustments: Rates will remain firm for the initial first year of the Contract and such rates shall be deemed the “Initial Base Rates”. Engineer must request rate adjustments, in writing, at least thirty (30) days prior to each annual anniversary date of the Contract and any rate changes will take effect on the first day following the prior year. If Engineer fails to request a CPI rate adjustment, as set forth herein, the adjustment will be effective thirty (30) days after the County receives Engineer’s written request. No retroactive rate adjustments will be allowed. Price adjustments will be made in accordance with changes in the U.S. Department of Labor Consumer Price Index (CPI-U) for All Urban Consumers, All Items, South Region (Base 1982-84 = 100). The rate adjustment will be determined by multiplying the Initial Base Rates by a fraction, the numerator of which is the index number for most recently released index before each annual anniversary date of the Contract and the denominator of which is the index number for the first month of the Contract (the index number for the month in which the Contract was originally executed). If the products are greater than the Initial Base Rates, County will pay the greater amounts as the rates during the successive year until the next rate adjustment. Rates for each successive year will never be less than the Initial Base Rates. E XHIBIT 49.00 EXHIBIT D - RATE SCHEDULE CORRIDOR E INLAND GEODETICSXxxxxxxx Corridor – Segment 2 AmaTerra Environmental, LLC Inc. CATEGORY RATE PROJECT MANAGER Project Manager $169.71 LICENSED STATE LAND SURVEYOR $161.81 REGISTERED PROFESSIONAL LAND SURVEYOR $165.76 SURVEY TECHNICIAN $119019 CLERICAL SUPPORT $68.41 2-PERSON SURVEY CREW 142.00 Architectural Historian/Historian IV $150.00 3Architectural Historian/Historian III $125.00 Architectural Historian/Historian II $89.00 Architectural Historian/Historian I $73.00 Archeologist VI/Sr. Principal Investigator $136.00 Archeologist V/Principal Investigator/Lab Supervisor $101.00 Archeologist IV/Project Archeologist $94.00 Archeologist III/Field Director $85.00 Archeologist II/Crew Chief $77.00 Archeologist I/Field Technician $67.00 GIS Specialist $115.00 GIS Technician/Illustrator/Drafter $76.00 Admin. $107.00 Document Production/Editor $81.00 Clerical $66.00 EXHIBIT E Xxxxxxxxxx County Vendor Reimbursement Policy The purpose of this Xxxxxxxxxx County Vendor Reimbursement Policy (“Policy”) is to provide clear guidelines to vendors on Xxxxxxxxxx County’s expectations and requirements regarding allowable reimbursable expenditures and required backup. The Policy will also minimize conflicts related to invoice payments and define non-PERSON SURVEY CREW $170.00 4-PERSON SURVEY CREW $190.00 ADDITIONAL CREW MEMBER $54.00 DIRECT EXPENSES GPS FIELD OPERATOR & VEHICLE & GPS RECEIVER $120.00 ALL TERRAIN VEHICLE (PER DAY) $55.00 ADDITONAL VEHICLE (PER DAY) $60.00reimbursable items. This Policy is considered a guideline and is not a contract. This Policy may be altered, deleted or amended, at any time and without prior notice to vendors, by action of the Xxxxxxxxxx County Commissioners Court. Unenforceable provisions of this Policy, as imposed by applicable law, regulations, or judicial decisions, shall be deemed to be deleted. Any revisions to this Policy will be distributed to all current vendors doing business with the County.
Appears in 1 contract
Samples: Williamson County Contract