Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.
Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.
WSIB Top-Up a) Teachers who, as of August 31, 2014, were entitled to Workplace Safety and Insurance Board benefits top-up, such entitlement shall be as follows:
Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.
COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in the Summary Schedule (attached) are formally approved as actual costs for fiscal year 2020-21, and as estimated costs for fiscal year 2022-23 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2022, for further allocation to federal grants and contracts performed by the respective county departments.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.
Tandem Switched Transport 7.3.4.2.1 For traffic delivered through a CenturyLink or CLEC tandem Switch (as defined in the Agreement), the Parties agree that, because this State is a new market for CLEC, tandem switched transport functions for Exchange Service (EAS/Local) non-transit traffic shall be compensated based upon the xxxx and keep compensation mechanism. Xxxx and keep will apply to both the tandem switching rate and the tandem transmission rate. Xxxx and keep shall govern compensation for such traffic exchanged by the Parties in this State until the earlier of: (1) the expiration of the Agreement, or (2) further action by the Federal Communications Commission (FCC), or a court of competent jurisdiction, vacates, replaces, modifies, or supersedes the applicable rules adopted in Order on Remand and Report and Order, CC Docket Nos. 96-98, 00-00, XXX 00-000 (xxx. Apr. 27, 2001). 7.3.4.2.2 Intentionally Left Blank.
Single Point of Contact The Contractor must provide, at the request of the Authorized User, a Single Point of Contact (SPOC) regardless of the breadth of the services being provided. The Contractor is required to provide the name and contact telephone numbers (desk, cell phone etc.) of the SPOC. RETAINAGE The Authorized User may retain a percentage of each deliverable payment of no more than twenty-five (25) percent until the acceptance of the complete Implementation. This retainage may be reduced up to 5 percent as described in the SOW, when the Contractor substantially reduces the time required from the timeframes negotiated between the Authorized User and the Contractor. ENHANCEMENTS TO SERVICES When the right is reserved in the RFQ, unanticipated enhancements to the services procured not exceeding a cumulative twenty (20) percent of the Implementation Service cost may be agreed to by the Authorized User. Such inclusion must be included in the Total Cost Evaluation. Such unanticipated enhancements will require a written Authorized User Agreement revision, which for NYS Agency Authorized Users will include an amended Purchase Order. Any changes that will result in exceeding this twenty (20) percent will require a new competitive RFQ. Contractor shall notify the Authorized User in writing when a requested scope change will exceed the cumulative twenty (20) percent total value of the Implementation Services.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
What Forms of Distribution Are Available from a Xxxxxxxxx Education Savings Account Distributions may be made as a lump sum of the entire account, or distributions of a portion of the account may be made as requested.