Current Fishing Methods Sample Clauses

Current Fishing Methods. Currently most fishing vessels in the Azerbaijan sector of the Southern Caspian use cone- shaped nets for kilka fishing with the use of electric light. Electric fishing is widely used and was developed by Xxxxxxxxx X.X. Xxxxxxx. Later, developing this method further, I.V. Nikonorov and others used fish pumps, attracting fish with electric light. The high efficiency of new fishing methods has resulted in significant improvements in the volume of fish caught and the proportion of kilka caught within a haul with the use of electric light reaches up to 80%. Fishing for kilka in the Caspian Sea with the use of subsea electric light is most important as kilka are attracted to the light and gather near the catching devise. Later, centrifugal fish pumps and then airlifts were used for fishing. All three types of fishing are used on the Caspian i.e.: · Cone-shaped purse nets; · Centrifugal fish pumps; and · Airlift. Light attracts all three species of kilka; however anchovy kilka makes up the major share of commercial catches when fishing in water depths of 00-000x xxxxx xxx xxxxx. Xxxxxxx xxxxx lives in the open water of the Middle and Southern Caspian, avoiding low salinity water, while ordinary kilka are found in shallower nearshore waters (25-50m). In summer commercial populations of kilka are found all along the western and eastern coast of Caspian Sea, up to the Northern Caspian. The largest commercial populations of ordinary kilka can be found from the Mangyshlak peninsular to Kenderli Bay in the east and in the area of Makhachkala in the west. Regions especially rich with ordinary kilka in the southern part of the sea are Kianly- Turkmenbashi on the eastern coast, southwards from Salyan – Pirsagat on the western coast (Azerbaijan territorial waters). In these areas kilka is found in large quantities in winter as well. Fishing for kilka is carried out the year round (with the exception of May and June) from seine boats РС-300, specially re-equipped for kilka fishing in the Caspian Sea. Earlier commercial fishing was carried out mainly from refrigerator vessels such as “Druzhba” and “Zelenodolsk”. Vessels of “Druzhba” type are 57.2m long, 9m wide, displacement 850 ton and deadweight 180 ton. They operate with the use of two diesel-generators, 300 horsepower (hp) each, their cruising capacity is 20 days. These vessels were gradually replaced by vessels of “Zelenodolsk” type, which are 55.35m long, 9.5m wide, displacement 985 ton and deadweight 305 ton. They ar...
AutoNDA by SimpleDocs

Related to Current Fishing Methods

  • Billing Method 1.5.1 To receive payment for services rendered under this contract, the Contractor shall submit a fully completed invoice for work previously performed to: Minneapolis Public Housing Authority Attention: Accounts Payable, Suite 307 0000 Xxxxxxxxxx Xxx X, Xxxxxxxxxxx, XX 00000 or: xxxxxxxx@xxxxxxx.xxx

  • Accounting Methods Implement or adopt any material change in its accounting principles, practices or methods, other than as may be required by GAAP or any Governmental Entity.

  • Voting Method Unless otherwise provided by law, when a vote is taken upon any measure before the Board, with a quorum being present, a majority of the votes cast shall determine its outcome. A vote of "abstain" or "present," or a vote other than "yea" or "nay," or a failure to vote, is counted for the purposes of determining whether a quorum is present. A vote of "abstain" or "present," or a vote other than "yea" or "nay," or a failure to vote, however, is not counted in determining whether a measure has been passed by the Board, unless otherwise stated in law. The sequence for casting votes is rotated. On all questions involving the expenditure of money and on all questions involving the closing of a meeting to the public, a roll call vote shall be taken and entered in the Board's minutes. An individual Board member may request that a roll call vote be taken on any other matter; the President or other presiding officer may approve or deny the request but a denial is subject to being overturned by a majority vote of the members present. Any Board member may request that his or her vote be changed before the President announces the result. Any Board member may include a written explanation of his or her vote in the District file containing individual Board member statements; the explanation will not be part of the minutes. Minutes The Board Secretary shall keep written minutes of all Board meetings (whether open or closed), which shall be signed by the President and the Secretary. The minutes include:

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Other Methods of Procurement of Consultants’ Services The following table specifies methods of procurement, other than Quality and Cost-based Selection, which may be used for consultants’ services. The Procurement Plan shall specify the circumstances under which such methods may be used. Procurement Method

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

  • Particular Methods of Procurement of Consultants’ Services 1. Quality- and Cost-based Selection. Except as otherwise provided in paragraph 2 below, consultants’ services shall be procured under contracts awarded on the basis of Quality and Cost-based Selection.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!