Power Quality Neither the facilities of Developer nor the facilities of Connecting Transmission Owner shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, in accordance with IEEE Standard 519, or any applicable superseding electric industry standard. In the event of a conflict between ANSI Standard C84.1-1989, or any applicable superseding electric industry standard, ANSI Standard C84.1-1989, or the applicable superseding electric industry standard, shall control.
Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria
Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.
Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos. b. Each party agrees to use, and to cause its Permitted Sublicensees to use, the other party’s trademarks only in good faith and in a dignified manner consistent with such party’s use of the trademarks. Upon written notice to the breaching party, the breaching party has 30 days of the date of the written notice to cure the breach or the license will be terminated.
Sub-Advisor Compliance Policies and Procedures The Sub-Advisor shall promptly provide the Trust CCO with copies of: (i) the Sub-Advisor’s policies and procedures for compliance by the Sub-Advisor with the Federal Securities Laws (together, the “Sub-Advisor Compliance Procedures”), and (ii) any material changes to the Sub-Advisor Compliance Procedures. The Sub-Advisor shall cooperate fully with the Trust CCO so as to facilitate the Trust CCO’s performance of the Trust CCO’s responsibilities under Rule 38a-1 to review, evaluate and report to the Trust’s Board of Trustees on the operation of the Sub-Advisor Compliance Procedures, and shall promptly report to the Trust CCO any Material Compliance Matter arising under the Sub-Advisor Compliance Procedures involving the Sub-Advisor Assets. The Sub-Advisor shall provide to the Trust CCO: (i) quarterly reports confirming the Sub-Advisor’s compliance with the Sub-Advisor Compliance Procedures in managing the Sub-Advisor Assets, and (ii) certifications that there were no Material Compliance Matters involving the Sub-Advisor that arose under the Sub-Advisor Compliance Procedures that affected the Sub-Advisor Assets. At least annually, the Sub-Advisor shall provide a certification to the Trust CCO to the effect that the Sub-Advisor has in place and has implemented policies and procedures that are reasonably designed to ensure compliance by the Sub-Advisor with the Federal Securities Laws.
NMHS Governance, Safety and Quality Requirements 2.1 Participates in the maintenance of a safe work environment. 2.2 Participates in an annual performance development review. 2.3 Supports the delivery of safe patient care and the consumers’ experience including participation in continuous quality improvement activities in accordance with the requirements of the National Safety and Quality Health Service Standards and other recognised health standards. 2.4 Completes mandatory training (including safety and quality training) as relevant to role. 2.5 Performs duties in accordance with Government, WA Health, North Metropolitan Health Service and Departmental / Program specific policies and procedures. 2.6 Abides by the WA Health Code of Conduct, Occupational Safety and Health legislation, the Disability Services Act and the Equal Opportunity Act.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Substance Abuse Treatment Information Substance abuse treatment information shall be maintained in compliance with 42 C.F.R. Part 2 if the Party or subcontractor(s) are Part 2 covered programs, or if substance abuse treatment information is received from a Part 2 covered program by the Party or subcontractor(s).
Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.