CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.
Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.
CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly. 4.14.2 The Contractor shall not damage or endanger any portion of the Work or the work of the State or any separate contractors by cutting, patching or otherwise altering any work, or by excavation. The Contractor shall not cut or otherwise alter the work of the State or any separate contractor except with the written consent of the State and of such separate contractor. The Contractor shall not unreasonably withhold from the State or any separate contractor his consent to cutting or otherwise altering the Work.
Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf): a. Foundational Programs and Capabilities (As specified in Public Health Modernization Manual) b. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric: c. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Modernization Process Measure:
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.
Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.
Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.