Deck Systems Using Precast Concrete Sample Clauses

Deck Systems Using Precast Concrete. Partial Depth Deck Panels
AutoNDA by SimpleDocs

Related to Deck Systems Using Precast Concrete

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

  • Radiation Therapy/Chemotherapy Services This plan covers chemotherapy and radiation services. This plan covers respiratory therapy services. When respiratory services are provided in your home, as part of a home care program, durable medical equipment, supplies, and oxygen are covered as a durable medical equipment service.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!