Description of the Framework Phases Sample Clauses

Description of the Framework Phases. ‌ The NANoREG foresight system includes two main phases. The first phase is the Horizon Scanning (HS). The goal of this phase is to generate a list of applications, or group of applications, which are based on a specific nanomaterial and pertaining to a given industrial sector, which can be perceived as a potential threat to the safety of humans and the environment. To identify these applications, there is the need of data input, e.g. result of foresight studies on nanotechnology, weak signals (as defined in chapter 2.2.4.1). Data input can come from different sources. The second phase is the Screening Risk Assessment (SRA). This is the core of the system, where the identified applications are evaluated to estimate the potential risks for different relevant targets. The SRA proposed in this system is following the Ecological Risk Assessment framework of US-EPA (US-EPA, 1998). The particular nature of this approach, as described in chapter 2.2.5, makes it appropriate to integrate the socio-economic importance in the scientific risk assessment from the start of the procedure, pending the availability of applicable tools. The scope of the SRA is to develop and to evaluate risk hypotheses, giving as a result a set of qualitative evaluations of the potential of the application/s to be harmful, and giving some regulatory implications for safety assessment and management.
AutoNDA by SimpleDocs

Related to Description of the Framework Phases

  • DESCRIPTION OF THE WORKS Employer’s objectives The scope of the request includes the recommended monthly preventative, quarterly and annual maintenance that needs to be conducted to ensure all areas of the airports are lit and compliant. It will include all the other adhoc request (labor rates) where required upon approval by the maintenance manager. The compliance will be based on the following: • Maintenance as per OEM • Organizational guidelines and codes of practice • OHS act 93 – Occupational Health and Safety • ISO 9001 – Quality management • ISO 14001 – Environmental Management • SANS 10142 – The wiring code • ICAO Annex 14 chapter 5. • ACSA Maintenance Procedure D060 024M This scope entails the maintenance and repair of LV systems and all lighting at Costal airports. In brief, maintenance involves servicing, repairs, and testing of lights and LV systems. This involves carrying out maintenance on electrical equipment such as LV DBs, electrical plant, wiring enclosures and luminaires and associated control systems, portable appliances and other specific electrical equipment, in order to minimize downtime, and ensure that the equipment performs at optimal levels and functions to specification at the specified areas. Servicing - performing routine preventive maintenance as prescribed by the original equipment manufacturer (OEM), ACSA’s planned maintenance routines, and applicable legal and design standards. Repairs – responding to breakdowns, callouts and restoring the equipment to safe working conditions on an as and when basis. Advisory – telephonically guiding airport electricians under emergency situations to ensure systems are safely shutdown or returned to service within stringent times. System Performance Test – Testing equipment performance against the OEM, ACSA, and statutory requirements for compliance and return to service purposes. Extent of the works The Contractor will be fully responsible for meeting all requirements in this document regarding the Works. For each piece of equipment, all work will be carried out to standards as required by the Original Equipment Manufacturer (OEM) as well as any applicable governing law and/or regulations. Where OEM standards differ from those required by this document the more stringent requirement shall apply. The Contractor will be fully responsible for obtaining (and keeping up to date with) said requirements. The proposed minimum scheduled maintenance activities can be found in annex H.

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • Description of Work (a) that has been omitted or

  • Description of the Transfer The details of the transfer and of the personal data are specified in Annex B. The parties agree that Annex B may contain confidential business information which they will not disclose to third parties, except as required by law or in response to a competent regulatory or government agency, or as required under clause I(e). The parties may execute additional annexes to cover additional transfers, which will be submitted to the authority where required. Annex B may, in the alternative, be drafted to cover multiple transfers. ANNEX A

  • Description of the transfer(s) The details of the transfer(s), and in particular the categories of personal data that are transferred and the purpose(s) for which they are transferred, are specified in Annex I.B. Docking clause

  • Completion of Development Upon the completion of the whole development or complete phases of the development, Council may review this Agreement, in whole or in part, and may:

  • DESCRIPTION OF CONTRACT MODIFICATION This contract modification is made in accordance with Exhibit E-Revised-1, Contractual Terms and Conditions, Section 22. CHANGES, to be made part hereof for all pertinent purposes. The changes are as follows:

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Description of the Services 1.1 The scope of the service to be rendered is described more fully in the Annexures and Schedules referred to below: ❑ Annexure A – Scope / Specification ❑ Annexure C – Pricing Schedule 2 DELIVERABLES AND COMPLETION DATE The Deliverables, due for completion by and governed by this Schedule 1. In the event that the Service Provider fails to meet the delivery dates as agreed, the following penalties will be imposed:

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

Time is Money Join Law Insider Premium to draft better contracts faster.