Production Work Except as agreed to in writing by the Parties pursuant to the "Production Work" section of the Standard Online Commerce Terms & Conditions attached hereto as Exhibit F, MP will be responsible for all production work associated with the Affiliated MP Site, including all related costs and expenses.
Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.
Project Scope This section should contain SOW summary information including: o Project definition and expected duration o Project goals, objectives, o Priorities & expectations o Project approach & responsibilities o Overall coordination and assumptions
Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.
Design 4.2.1 Seller, at no cost to Edison, shall:
Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.
Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).
Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.
Project Completion Within five (5) days after the delivery by Supplier to Purchaser of a Commissioning Certificate for the Project’s final Turbine, Supplier shall also deliver to Purchaser a completion certificate for all Turbines in the Project (the “Project Completion Certificate”), in the form attached hereto as Exhibit N, together with a list of any remaining Punch List Work on any Turbine, a schedule for completing the Punch List Work and an estimate of the cost of each item of Punch List Work. Supplier shall thereafter promptly complete all Punch List Work.
Engineering Services The Borrower’s Engineer will provide engineering services covering planning and design, operation of the System, and the supervision and inspection of the construction of the Project. The Borrower’s Engineer will provide to the Department the certificate required by Section 3.4.