Development of an Internal Control System Sample Clauses

Development of an Internal Control System. To strengthen the transparency and accountability of the public administration, the authorities will develop and implement a system of internal control including internal audits, making the best use of technical assistance. By June 2017, the authorities will present to the Commission the proposal of the system of internal control including internal audit. The system will be fully implemented by December 2017. The internal control systems will be developed in close cooperation with the on-going technical assistance activities on Anti-Corruption and on Administrative Reform undertaken respectively by the OECD and Expertise France.
AutoNDA by SimpleDocs

Related to Development of an Internal Control System

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Standard Operating Procedures Over approximately the past eight years, the Parties have been supplying select Products to one another for use in the operation of their respective businesses within the United States of America, Canada and Mexico. The Parties developed and been following certain standard operating procedures in connecting with, among other topics, forecasting, production planning, ordering, delivering and resolving claims on the Products supplied to one another (the “Current SOPs”). The Parties will be updating their respective business systems over the next six months, and the updates to these business systems will require the Parties to modify the Current SOPs. Once the Parties have completed the updates to the business systems and agreed on the necessary modifications to the Current SOPs, the Parties will sign a written amendment to this Agreement appending the updated standard operating procedures (the “Updated SOPs”). Until the Parties have signed a written amendment appending the Updated SOPs, the parties will continue to follow the Current SOPs. The Parties will comply with the applicable SOPs in connection with the purchase and sale of products identified in a Purchase Schedule. The Parties may add terms and conditions to, and amend the terms and conditions of, the SOP in a Purchase Schedule, but any additional and amended terms and conditions in a Purchase Schedule supplementing and modifying the SOP will only apply the specific products identified in that Purchase Schedule for its duration.

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Accounting System Requirement The Contractor shall maintain an adequate system of accounting and internal controls that meets Generally Accepted Accounting Principles or “GAAP.”

Time is Money Join Law Insider Premium to draft better contracts faster.