Proposal Work Authorizations The State may issue a proposal work authorization under which the Engineer will submit a proposal for additional work. The proposal must be for additional work that is within the defined scope of work under this contract. The amount to be paid for a proposal work authorization will be a lump sum for each proposal. The lump sum payment will be no less than two percent (2%) and no more than four percent (4%) of the State's estimate of the cost of the additional work. The Engineer may elect without penalty not to submit a proposal in response to a proposal work authorization. Any proposal submitted in response to a proposal work authorization will be the sole property of the State. The State may, at its option, issue similar or identical proposal work authorizations under other contracts, and the proposals submitted in response to the various proposal work authorizations may be compared by the State for the purpose of determining the contract under which the work will be awarded. The determination of the contract under which the work will be awarded will be based on the design characteristics of the proposal and the Engineer's qualifications and will not consider the Engineer's rates.
Project Review A. Programmatic Allowances
Additional Information for Product Development Projects Outcome of product development efforts, such copyrights and license agreements. • Units sold or projected to be sold in California and outside of California. • Total annual sales or projected annual sales (in dollars) of products developed under the Agreement. • Investment dollars/follow-on private funding as a result of Energy Commission funding. • Patent numbers and applications, along with dates and brief descriptions. Additional Information for Product Demonstrations: • Outcome of demonstrations and status of technology. • Number of similar installations. • Jobs created/retained as a result of the Agreement.
Personnel File Review a. A unit member has the right upon his/her own request to review the contents of his/her personnel file. The review will be conducted in the presence of the administrator, or his/her designee, responsible for the safekeeping of such file. The employee may have a committee person assist in said review. Such review shall be conducted at a mutually agreeable time. A copy of requested material will be provided.
ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work: Drainage installation Subgrade compaction Rock compaction SUBSECTION RESTRICTIONS
Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.
SUPPLIER PUBLICATIONS 4.1 Any marketing materials in relation to this Framework Agreement that that Supplier produces must comply in all respects with the Branding Guidance. The Supplier will periodically update and revise such marketing materials.
For Product Development Projects and Project Demonstrations Published documents, including date, title, and periodical name. Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates. Greenhouse gas and criteria emissions reductions. Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits. Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project. A discussion of project product downloads from websites, and publications in technical journals. A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.
Project Reports 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than one month after the end of the period covered by such report.