DOG RUNS Sample Clauses

DOG RUNS. The AARC agrees to dedicate sufficient dog runs (at a minimum three) necessary for the City Animal Control Staff to routinely, throughout the day or night, place dogs delivered to the AARC. Dogs placed in these runs are to be frequently moved to other long-term animal runs to keep these dedicated runs free for regular animal delivery. These dedicated runs will be cleared of animals by the close of business and again by the open of business each day to assure adequate space for animals delivered to the AARC.
AutoNDA by SimpleDocs
DOG RUNS. Committee approval is required. Dog Runs must be located in the rear or side yard, abutting the home and substantially screened from view by planting fast- growing or mature trees or shrubs. Dog runs will be limited to two hundred‌‌ (200) square feet and cannot be higher than 4 feet 6 inches (4’6”). The fencing materials and design shall match the exterior of the home and/or fence. Dog runs must be stained in the same manner as described in Section 3.22 Fences and Attachment B: FENCE STAIN. Tarpaulins and chain-link will not be permitted.

Related to DOG RUNS

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • DRUG AND ALCOHOL TESTING Employees may be tested for drugs and/or alcohol pursuant to the provisions of the Employer's Drug and Alcohol Testing Policy which is attached hereto and made a part of this Agreement as if more fully set forth herein.

  • Drug-Free Workplace Certification As required by Executive Order No. 90-5 dated April 12, 1990, issued by the Governor of Indiana, the Company hereby covenants and agrees to make a good faith effort to provide and maintain a drug-free workplace at the Project Location. The Company will give written notice to the IEDC within ten (10) days after receiving actual notice that the Company, or an employee of the Company in the State of Indiana, has been convicted of a criminal drug violation occurring in the workplace. False certification or violation of this certification may result in sanctions including, but not limited to, suspension of payments under the Agreement, termination of the Agreement and/or debarment of contracting opportunities with the State for up to three (3) years. In addition to the provisions of the above paragraph, if the total amount set forth in the Agreement is in excess of $25,000.00, the Company agrees that it will provide a drug-free workplace by: A. Publishing and providing to all of its employees a statement notifying them that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the Company’s workplace, and specifying the actions that will be taken against employees for violations of such prohibition;

  • CONTRACTOR NAME CHANGE An amendment is required to change the Contractor's name as listed on this Agreement. Upon receipt of legal documentation of the name change the State will process the amendment. Payment of invoices presented with a new name cannot be paid prior to approval of said amendment.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • DRUG/ALCOHOL TESTING Section 33.1 Drug testing may be conducted on employees during their duty hours upon reasonable suspicion or randomly by computer selection. Alcohol testing will be conducted only upon reasonable suspicion. Reasonable suspicion that an employee used or is using a controlled substance or alcohol in an unlawful or abusive manner may be based upon, but not limited to: A. Observable phenomena, such as direct observation of drug or alcohol use or possession and/or the physical symptoms of being under the influence of a drug or alcohol; B. A pattern or abnormal conduct or erratic behavior, including abnormal leave patterns; C. Arrest or conviction for a drug or alcohol-related offense, or the identification of an employee as the focus of a criminal investigation into illegal drug or alcohol possession, use, or trafficking; D. Information provided either by reliable and credible sources or independently corroborated; E. Evidence that an employee has tampered with a previous drug test; F. Facts or circumstances developed in the course of an authorized investigation of an accident or unsafe working practices. Section 33.2 Drug/alcohol testing shall be conducted solely for administrative purposes and the results obtained shall not be used in criminal proceedings. Under no circumstances may the results of drug/alcohol screening or testing be released to a third party for use in a criminal prosecution against the affected employee. The following procedure shall not preclude the Employer from other administrative action but such actions shall not be based solely upon the initial reagent testing results alone. Section 33.3 All drug screening tests shall be conducted by laboratories meeting the standards of the Substance Abuse and Mental Health Service Administration. No test shall be considered positive until it has been confirmed by a Gas Chromatography/Mass Spectrometry. The procedures utilized by the Employer and testing laboratory shall include an evidentiary chain of custody control and split sample testing. All procedures shall be outlined in writing and this outline shall be followed in all situations arising under this article. Section 33.4 Alcohol testing shall be done in accordance with the law of the State of Ohio to detect drivers operating a motor vehicle under the influence. A positive result shall entitle the Employer to proceed with sanctions as set forth in this Article. Section 33.5 The results of the testing shall be delivered to a specified employee of the Employer with command responsibility and the employee tested. An employee whose confirmatory test result is positive shall have the right to request a certified copy of the testing results in which the vendor shall affirm that the test results were obtained using the approved protocol methods. The employee shall provide a signed release for disclosure of the testing results to the Employer. A representative for the bargaining unit shall have a right of access to the results upon request to the Employer, with the employee’s written consent. Refusal to submit to the testing provided for under this Agreement may be grounds for discipline. A. If a drug screening test is positive, a confirmatory test shall be conducted utilizing the fluid from the primary sample. B. In the event that any confirmation drug test results are positive, the employee is entitled to have the split sample tested by another DHHS-certified lab in the manner prescribed above at the employee’s expense. The employee must request the split sample test within seventy-two (72) hours of being notified of a positive result. The results of this test, whether positive or negative, shall be determinative. Section 33.7 A list of three (3) testing laboratories shall be maintained by the Employer. These laboratories shall conduct any testing directed by the Employer. The Employer shall obtain the approval of the bargaining unit representative as to any laboratories put on this list, which approval shall not be unreasonably withheld. Section 33.8 If after the testing required above has produced a positive result the Employer may require the employee to participate in any rehabilitation or detoxification program that is covered by the employee’s health insurance. Discipline allowed by the positive findings provided for above shall be deferred pending rehabilitation of the employee within a reasonable period. An employee who participates in a rehabilitation or detoxification program shall be allowed to use sick time and vacation leave for the period of the rehabilitation or detoxification program. If no such leave credits are available, the employee shall be placed on medical leave of absence without pay for the period of the rehabilitation or detoxification program. Upon completion of such program and upon receiving results from a retest demonstrating that the employee is no longer abusing a controlled substance/alcohol, the employee shall be returned to his/her former position. Such employee may be subject to periodic retesting upon his/her return to his/her position for a period of one (1) year from the date of his/her return to work. Any employee in a rehabilitation or detoxification program in accordance with this Article will not lose any seniority or benefits, should it be necessary for the employee to be placed on medical leave of absence without pay, for a period not to exceed ninety (90) days. Section 33.9 If the employee refuses to undergo rehabilitation or detoxification, or if he/she tests positive during a retesting within one (1) year after his/her return to work from such a program, the employee shall be subject to disciplinary action, including removal from his/her position and termination of his/her employment. Section 33.10 Costs of all drug screening tests and confirmatory tests shall be borne by the Employer except that any test initiated at the request of the employee shall be at the employee’s expense. Section 33.11 The Employer may conduct four (4) tests of an employee during the one (1) year period after the employee has completed a rehabilitation or detoxification program as provided above. Section 33.12 The provisions of this Article shall not require the Employer to offer a rehabilitation/detoxification program to any employee more than once.

  • Safety Footwear 1. The State will provide employees in the positions listed in Section 3 below, and employees who are currently required to wear safety footwear by Department Work Rules, an allowance of one hundred fifty dollars ($150.00) for replacement of safety footwear. This allowance will be paid to employees on a semiannual basis, with half paid in January and half paid in July to eligible employees on the payroll at the time of the payments. Employees of Departments with work rules that provide such safety footwear will not be eligible for the safety footwear allowance. 2. Safety footwear purchased must meet ANSI standards where applicable. Requirements for the wearing of safety footwear will be in accordance with work rules published by the State. 3. Positions required to wear safety footwear:

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Contractor Name Business License #: Address: City, State, Zip Code: Telephone: Facsimile: Email: * If you are an independent contractor you are required to obtain a business license with the City of Thousand Oaks. Contractor certifies under penalty of perjury that Contractor is a Sole Proprietor Corporation Limited Liability Company Partnership Nonprofit Corporation Other [describe: ]

  • Uncovering and Correction of Work 12.1 The Contractor shall promptly correct Work rejected by the Owner or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of two years from the date of Substantial Completion, or by terms of an applicable special warranty required by the Contract Documents. The provisions of this Article apply to work done by Subcontractors as well as to Work done by direct employees of the Contractor. 12.2 At any time during the progress of the work, or in any case where the nature of the defects shall be such that it is not expedient to have them corrected, the Owner, at their option, shall have the right to deduct such sum, or sums, of money from the amount of the contract as they consider justified to adjust the difference in value between the defective work and that required under contract including any damage to the structure.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!