Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.
Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Sidewalks Within three months of the effective date of this Agreement, the County will implement and report to the Department its written process for soliciting and receiving input from persons with disabilities regarding the accessibility of its sidewalks, including, for example, requests to add curb cuts at particular locations. Within three months of the effective date of this Agreement, the County will identify and report to the Department all streets, roads, and highways that have been constructed or altered since January 26, 1992. Paving, repaving, or resurfacing a street, road, or highway is considered an alteration for the purposes of this Agreement. Filling a pothole is not considered an alteration for the purposes of this Agreement. Within three years of the effective date of this Agreement, the County will provide curb ramps or other sloped areas complying with the Standards or UFAS at all intersections of the streets, roads, and highways identified under this paragraph having curbs or other barriers to entry from a street level pedestrian walkway. Beginning no later than three months after the effective date of this Agreement, the County will provide curb ramps or other sloped areas complying with the Standards or UFAS at any intersection having curbs or other barriers to entry from a street level pedestrian walkway, whenever a new street, road, or highway is constructed or altered. Within three months of the effective date of this Agreement, the County will identify all street level pedestrian walkways that have been constructed or altered since January 26, 1992. Paving, repaving, or resurfacing a walkway is considered an alteration for the purposes of this Agreement. Within three years of the effective date of this Agreement, the County will provide curb ramps or other sloped areas complying with the Standards or UFAS at all places where a street level pedestrian walkway identified under this paragraph intersects with a street, road, or highway. Beginning no later than three months after the effective date of this Agreement, the County will provide curb ramps or other sloped areas complying with the Standards or UFAS at all newly constructed or altered pedestrian walkways where they intersect a street, road, or highway. WEB-BASED SERVICES AND PROGRAMS Within one month of the effective date of this Agreement, and on subsequent anniversaries of the effective date of this Agreement, the County will distribute to all persons – employees and contractors – who design, develop, maintain, or otherwise have responsibility for content and format of its website(s) or third party websites used by the County (Internet Personnel) the technical assistance document, "Accessibility of State and Local Government Websites to People with Disabilities," which is Attachment H to this Agreement (it is also available at xxx.xxx.xxx/xxxxxxxx0.xxx). Within three months of the effective date of this Agreement, and throughout the life of the Agreement, the County will do the following: Establish, implement, and post online a policy that its web pages will be accessible and create a process for implementation; Ensure that all new and modified web pages and content are accessible; Develop and implement a plan for making existing web content more accessible; Provide a way for online visitors to request accessible information or services by posting a telephone number or e-mail address on its home page; and Periodically (at least annually) enlist people with disabilities to test its pages for ease of use. NEW CONSTRUCTION, ALTERATIONS, AND PHYSICAL CHANGES TO FACILITIES The County will ensure that all buildings and facilities constructed by or on behalf of the County are constructed in full compliance with the requirements of 28 C.F.R. § 35.151, including applicable architectural standards. The County will ensure that alterations to County facilities are made in full compliance with the requirements of 28 C.F.R. § 35.151, including applicable architectural standards. The elements or features of the County's facilities that do not comply with the Standards, including those listed in Attachments I, J, K, and L, prevent persons with disabilities from fully and equally enjoying the County's services, programs, or activities and constitute discrimination on the basis of disability within the meaning of 42 U.S.C. § 12132 and 28 C.F.R. §§ 35.149 and 35.150. The County will comply with the cited provisions of the Standards when taking the actions required by this Agreement. Within three months of the effective date of this Agreement, the County will install signage as necessary to comply with 28 C.F.R. § 35.163(b), after having surveyed all facilities that are the subject of this Agreement for the purpose of identifying those that have multiple entrances not all of which are accessible. Newly Constructed Facilities: In order to ensure that the following spaces and elements in County facilities for which construction was commenced after January 26, 1992, are readily accessible to and usable by persons with disabilities, the County will take the actions listed in Attachments I and M. Altered Facilities: In order to ensure that the following spaces and elements in County facilities for which alterations commenced after January 26, 1992, are readily accessible to and usable by persons with disabilities, the County will take the actions listed in Attachments J and M. Program Access in Existing Facilities: In order to ensure that each of the County's programs, services, and activities operating at a facility that is the subject of this Agreement, when viewed in its entirety, is readily accessible to and usable by persons with mobility impairments, the County will take the actions listed in Attachments K and M. Facilities and Programs Not Surveyed by the Department: The County will review compliance with the requirements of Title II of the ADA for those County facilities and programs that were not reviewed by the Department. Within twelve months of the effective date of this Agreement, the County will submit for review by the Department a detailed report listing the access issues identified during its review together with the corrective actions and completion dates proposed to resolve such issues. The review conducted by the County, the access issues identified, and the corrective actions and completion dates proposed will be consistent with the requirements of title II of the ADA; the review of County facilities and programs conducted by the Department for purposes of this Agreement; and the access issues, corrective actions, and completion dates reflected in Attachments I, J, K, and M. PROGRAM MODIFICATIONS Access to Programs Housed in Others' Facilities: In order to ensure that the County's programs, services, and activities that are the subject of this Agreement and that are operated by the County at facilities owned or controlled by other entities, when viewed in its entirety, are readily accessible to and usable by persons with mobility impairments, the County will take the actions listed in Attachment L. PROGRAMS FOR VICTIMS OF DOMESTIC VIOLENCE AND ABUSE If the County owns or operates any Domestic Violence Programs, within three months of the effective date of this Agreement, it will do the following: Whatever written information is provided regarding its Domestic Violence Programs will also be provided in alternate formats, including Braille, large print, audio recording, and electronic formats (e.g., HTML), upon request. Enter into contracts or make other arrangements with qualified sign language and oral interpreters to ensure their availability when required for effective communication with persons who are deaf or hard of hearing. The type of aid that will be required for effective communication will depend on the individual's usual method of communication, and the nature, importance, and duration of the communication at issue. In many circumstances, oral communication supplemented by gestures and visual aids, an exchange of written notes, use of a computer or typewriter, or use of an assistive listening device may be effective. In other circumstances, qualified sign language or oral interpreters are needed to communicate effectively with persons who are deaf or hard of hearing. The more lengthy, complex, and important the communication, the more likely it is that a qualified interpreter will be required for effective communication with a person whose primary means of communication is sign language or speech reading. If the County's Domestic Violence Programs operate a hotline to take telephone calls of an emergency nature, the County shall ensure that it provides equivalent service for persons who use TTY's, including providing direct-connection service for TTY users with hotline operators, without requiring TTY users to call through a third party operator, such as through the state or local Telecommunication Relay Services. The County will obtain the necessary equipment, establish the written procedures, and provide the training necessary to ensure effective communication by Hotline staff with direct-connection callers using TTY's, as well as the training necessary to respond to callers who use the Telecommunication Relay Services. Survey facilities used as shelters or designated as potential shelters – or for counseling, job training, education, clothing or household provisioning, or other aspects of Domestic Violence Programs – to ensure that adequate arrangements are available for potential clients and family members with disabilities, including adults and children who have mobility impairments, who are blind or have low vision, and who are deaf or hard of hearing. Within one year of the effective date of this Agreement, modify each such facility to remove the barriers or, alternatively, procure another, fully accessible facility to ensure that potential clients and family members with disabilities have integrated options when participating in a sheltering or other Domestic Violence program. Nothing in this Agreement requires any modifications that would compromise the confidentiality of a shelter or counseling center. Until there is a sufficient stock of accessible housing and other facilities within the sheltering program, the County will implement written procedures ensuring that it has identified temporary accessible housing (such as accessible hotel rooms within the community or in nearby communities) and other facilities that could be used if people with disabilities need sheltering or inservice access to a Domestic Violence Program. The cost to potential clients of being housed or otherwise served in alternate accessible facilities shall not exceed any costs normally attributed to clients of the County's Domestic Violence Programs. Implement written procedures and modify, as appropriate, eligibility criteria, to ensure that no person with a disability is turned away from a shelter or otherwise denied the opportunity to benefit from the services of the County's Domestic Violence Programs on the basis of disability. Implement written procedures to ensure that persons with disabilities who use service animals are not denied or discouraged from participating in Domestic Violence Programs, are able to be housed and served in an integrated environment, and are not separated from their service animals while participating in the County's Domestic Violence Programs even if pets are normally not permitted in the facilities where such programs are conducted. The procedures will not segregate persons who use service animals from others but may take into account the potential presence of persons who, for safety or health reasons, should not be in contact with certain types of animals. If the County's Domestic Violence Programs require clients to make any payments for shelter or other services they provide, clients shall not be required to make additional payments because they or their family members use service animals. Implement written procedures to ensure that reasonable modifications are made to the County's Domestic Violence Programs when necessary for a client or family member with a disability to participate in such Programs, unless doing so would fundamentally alter the nature of the program. Implement written policies to ensure that despite any "drug-free" policy of the County's Domestic Violence Programs, persons with disabilities who use medication prescribed for their use are able to continue using such medication while participating in such Programs or being housed in a shelter. If the County contracts with another entity to provide or operate programs that provide shelter, counseling, or other assistance or supportive services to victims of domestic violence or abuse and their families (hereafter referred to as "Domestic Violence Programs"), it will ensure that the other entity complies with the preceding provisions on its behalf. If that entity will not comply with the following provisions, the County will nonetheless take all necessary steps to ensure that its program is accessible to persons with disabilities. Some of the of the County's shelters may be owned or operated by other public entities subject to title II or by public accommodations subject to title III and, as such, are subject to the obligation to provide program access or remove barriers to accessibility under the ADA. This Agreement does not limit such future enforcement action against the owners or operators of these facilities by any person or entity, including the Department. This Agreement shall not be construed to require the County to divulge confidential information relating to the location or existence of any Domestic Violence Programs, beyond what is otherwise required by applicable law or what is necessary for the Department to effectively enforce this Agreement.
Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.
Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.
Procurement of the Site (i) The Authority Representative, the Contractor and Authority’s Engineer shall, within 10 (ten) days of the date of this Agreement, inspect the Site and prepare a detailed memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (hereinafter referred to as the “Handover Memorandum”). Subject to the provisions of Clause 8.2 (iii), the Handover Memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been given to the Contractor along with details of hindrances in the Construction Zone. For sake of clarity the Handover Memorandum shall clearly specify the parts of Site where work can be executed. Signing of the Handover Memorandum, in three counterparts (each of which shall constitute an original), by the authorized representatives of the Authority, Contractor and Authority’s Engineer shall be deemed to constitute a valid evidence of giving the Right of Way to the Contractor for discharging its obligations under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. (ii) Whenever the Authority is ready to hand over any part or parts of the Site included in the Appendix, it shall inform the Contractor, by notice, of the proposed date and time such of hand over. The Authority Representative and the Contractor shall, on the date so notified, inspect the specified parts of the Site, and prepare a memorandum containing an inventory of the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site so handed over. The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to the Contractor. If the contractor fails to join for site inspection or disputes the parts of the site available for work, the Authority’s Engineer shall decide the parts of the site where work can be executed and notify to both the parties within 3 days of the proposed date of inspection. The parties agree that such notification of the Authority’s Engineer as mentioned hereinabove shall be final and binding on the parties. (iii) The Authority shall provide the Right of Way to the Contractor in respect of all land included in the Appendix by the date specified in Schedule-A for those parts of the Site referred to therein, and in the event of delay for any reason other than Force Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor, Damages in a sum calculated in accordance with Clause 8.3. The Contractor agrees that it shall not be entitled to claim any other damages on account of any such delay by the Authority. (iv) Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall specify the parts of the Site, if any, for which Right of Way shall be provided to the Contractor on the dates specified in Schedule-A. Such parts shall also be included in the Appendix prepared in pursuance of Clause 8.2 (i). (v) The Authority further acknowledges and agrees that prior to the Appointed Date, it shall have procured issuance of the statutory notification under Applicable Laws for vesting of all the land comprising the Project in the Authority and has taken possession of area for Construction Zone for at least 90% (ninety per cent) of the total length of the Project Highway. The Parties also acknowledge and agree that the conditions specified in this Clause 8.2 (iii) shall not be modified or waived by either Party. (vi) For the avoidance of doubt, the Parties expressly agree that the Appendix shall in no event contain sections of the Project Highway the cumulative length of which exceeds 10% (ten percent) of the total length of the Project Highway. (vii) Pursuant to signing of Handover Memorandum under clause 8.2 (i), Contractor shall submit to the Authority’s Engineer, a monthly land possession report till expiry of 180 (one hundred and eighty) days from Appointed Date, in respect of those parts of the site to which vacant access and right of way was not given to the contractor and included in Appendix to the memorandum signed under clause 8.2 (i), duly specifying the part of the site, if any, for which the right of way is yet to be handed over.
Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.