DRI Plant and Its Constraints Sample Clauses

DRI Plant and Its Constraints. The DRI plant produces direct-reduced iron from iron ore using gas based or coal based process. DRI production process is described very shortly as following: iron oxide is preheated and reduced by reducing gas (H2 + CO) in the shaft. The inputs to DRI plant is Syngas from POX plant, hydrogen from Carbon Black and electricity from Gas fired power plant. The output is direct reduced iron, heat and gases. Some of the output gases are recycled again to produce reducing gas. H2 H2, CO2, CO H2 H2 Figure 7-6 Input and output flow of the DRI plant DRI plant parameters
AutoNDA by SimpleDocs

Related to DRI Plant and Its Constraints

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Operations Matters Section 1.7 of Article I of the Agreement is deleted in its entirety and replaced with the following:

  • Finishing Work It has been clearly understood by the Alottee, that the Occupancy Certificate/Completion Certificate, as the case may be, are issued by the concerned authorities, when the entire civil construction work of the apartment is complete and the apartment is in a habitable state, however, to prevent any loss or damage, the internal fittings, furnishings and finishing work is done after obtaining completion certificate/occupancy certificate as the case may be. Further the internal fittings, furnishings and finishing work may also depend upon the choice of the Allottee. Therefore to ensure that there is no loss or damage to the internal fittings, furnishings and finishing work and the same may be carried on as per the choice of the Allottee, internal works such as fitting of switch boards, doors, sanitary fittings, plumber fittings like water taps/showers etc., final colour coat on the internal walls, floor tiles or any other internal work of like nature, shall be completed after obtaining occupancy certificate/completion certificate and before handing over the possession of the apartment to the Allottee.

  • Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.

  • Management and Control Systems Grantee will:

  • Repair Services RIM, either directly or through its authorized service providers, will provide You with Repair Services using new or refurbished parts or a new or refurbished BlackBerry PlayBook. Any Repair Services under this Agreement are conditioned upon the return of Your BlackBerry PlayBook to RIM or a RIM authorized service provider (as set out in Your RMA form). In the event RIM provides You with a replacement BlackBerry PlayBook (an “Advanced Exchange PlayBook” or “Advanced Exchange Service”) or when the exchange of the BlackBerry PlayBook (or parts thereof) are provided under this Agreement, Your BlackBerry PlayBook or Your BlackBerry PlayBook parts received by RIM or RIM’s authorized service provider become the property of RIM and the Advanced Exchange PlayBook or BlackBerry PlayBook parts sent to You by RIM or RIM’s authorized service provider become Yours.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Environmental constraints and management Describe or cross refer to environmental constraints applicable to the Contractor’s plan and his activities on the Affected Property and how they should be managed. Include here or cross refer to an Annexure to the Service Information. The Contractor shall comply with the environmental criteria and constraints stated in Annexure

Time is Money Join Law Insider Premium to draft better contracts faster.