Drywall Walls; Typical Sample Clauses

Drywall Walls; Typical a. Coat 1: Latex sealer.
AutoNDA by SimpleDocs

Related to Drywall Walls; Typical

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • FINISHES Buyer(s) understands that the location of telephone, electric, cable TV and other utility outlets, doors, windows, air conditioning components, lighting fixtures, equipment and fixtures are subject to change and Buyer(s) understands that materials such as brick, wood, wood grain, carpeting, paint, cabinets, cultured marble, tile, Formica, granite and the like are subject to shading and gradation and may vary from samples, models or color charts, and from piece to piece, and Contractor shall not be liable for such variations.

  • Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. Experience: A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Bathrooms Record the number of bathrooms found on the concerned premises. (7) Common Areas. Furnish the number of common or communal areas available to the Roommates on the premises. (8) Private Areas. Report the number of private rooms or areas found on the premises that the Roommates can access and utilize (alone). III. Term (9)

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.