Easements for Grading Sample Clauses

Easements for Grading. Declarant, its successors and assigns, shall have a five (5) foot easement on each side of all lot lines of each lot within Xxxxxxxxxx Farms, Phase One, for grading, etc.
AutoNDA by SimpleDocs

Related to Easements for Grading

  • Easements Lessor reserves to itself the right, from time to time, to grant such easements, rights and dedications that Lessor deems necessary or desirable, and to cause the recordation of Parcel Maps and restrictions, so long as such easements, rights, dedications, Maps and restrictions do not unreasonably interfere with the use of the Premises by Lessee. Lessee shall sign any of the aforementioned documents upon request of Lessor and failure to do so shall constitute a material breach of this Lease.

  • Easement To the extent applicable, Owner agrees to grant to Bell a non-exclusive easement and statutory right of way and/or a path to the property line from the Building, as the case may be and in or through the Equipment Space if it is determined that a fibre optic cable or such other Equipment must be installed to the Building and/or in the Equipment Space. Owner and Bell shall in advance, agree upon a suitable location to install the fibre optic cable on the property of the Owner. Owner agrees to allow Bell to register, at Xxxx'x expense, the easement and right of way, and/or notice of this Agreement

  • ROAD TOLERANCES Purchaser shall perform road work within the tolerances listed below. The tolerance class for each road is listed on the TYPICAL SECTION SHEET. Tolerance Class A B C Road and Subgrade Width (feet) +1.5 +1.5 +2.0 Subgrade Elevation (feet +/-) 0.5 1.0 2.0 Centerline alignment (feet lt./rt.) 1.0 1.5 3.0 1-6 ORDER OF PRECEDENCE Any conflict or inconsistency in the road plan will be resolved by giving the documents precedence in the following order:

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: IS sieve Designation Percentage Passing by weight for graded aggregate of nominal size. 40mm 20mm 16mm 12.5mm 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.