ELECTRIC WATER COOLERS Sample Clauses

ELECTRIC WATER COOLERS. Electric water coolers, Cordley and Xxxxx, Xxxxxx Xxxxxx, Westinghouse, or approved equal, with cup dispensers, must be installed with cold water piping and sanitary drains. A minimum of two (2) are required, and one (1) per floor will be required in multi-floor locations. If more than one bureau is involved in this lease, then a minimum of two (2) per bureau are required.
AutoNDA by SimpleDocs
ELECTRIC WATER COOLERS. XXXX wall-mount ADA accessible type, stainless steel top and cabinet, with adjustable thermostat. Minimum 6.7 gph of 50 degree F water with 90 degree F ambient temperature. Storage tank shall be of double wall construction with copper cooling coils and insulation jacket. Frame shall be minimum 16-gauge welded steel construction. Power supply characteristics shall be 115 volt, single phase, 60 Hz. Water coolers shall be UL listed and be certified by OSHA and ARI.

Related to ELECTRIC WATER COOLERS

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.

  • Electric Service 1. The Authority shall make available Electric Service to enable the Customer to receive the Allocation in accordance with this Agreement, Service Tariff No. WNY-2 and the Rules. 2. The Customer shall not be entitled to receive Electric Service under this Agreement for any EP and/or RP allocation unless such EP and/or RP allocation is identified in Schedule A. 3. The Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation specified in Schedule A. If Schedule C specifies a Takedown Schedule for the Allocation, the Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation in accordance with such Takedown Schedule. 4. The Authority shall provide UCAP in amounts necessary to meet the Customer’s NYISO UCAP requirements associated with the Allocation in accordance with the NYISO Tariffs. The Customer shall be responsible to pay the Authority for such UCAP in accordance with Service Tariff No. WNY-2. 5. The provision of Electric Service associated with the Allocation is an unbundled service separate from the transmission and delivery of power and energy to the Customer. The Customer acknowledges and agrees that Customer’s local electric utility, not the Authority, shall be responsible for delivering the Allocation to the Facility specified in Schedule A in accordance with the applicable Utility Tariff(s). 6. The Contract Demand for the Customer’s Allocation may be modified by the Authority if the amount of Firm Power and Firm Energy available for sale as EP or RP from the Project is modified as required to comply with any ruling, order, or decision of any regulatory or judicial body having jurisdiction, including but not limited to FERC. Any such modification will be made on a pro rata basis to all EP and RP customers, as applicable, based on the terms of such ruling, order, or decision. 7. The Contract Demand may not exceed the Allocation. 8. The Customer’s Facility must be metered by the Customer’s local electric utility in a manner satisfactory to the Authority, or another metering arrangement satisfactory to the Authority must be provided (collectively, “Metering Arrangement”). A Metering Arrangement that is not satisfactory to the Authority shall be grounds, after notice to the Customer, for the Authority to modify, withhold, suspend, or terminate Electric Service to the Customer. If a Metering Arrangement is not made to conform to the Authority’s requirements within thirty

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!