Mechanical Work. Includes the work released to the mechanical Subcontractor covering the mechanical erection of the equipment, and the geothermal fluid gathering system. Includes the work released to the electrical subcontractor covering the electrical interconnection of major components, and terminals of the power and control cabinets.
Mechanical Work. Any type of work on autos, motorcycles, boats etc. is prohibited.
Mechanical Work. PREAMBLES
Mechanical Work. Supply and install 100KVa backup generator No 1 Allow a sum on Mechanical Works,Inclusive of Air conditioning and Fire water reticulation around the station to include Fire hydrants and signage. sum
Mechanical Work. The Contractor shall be responsible for the full development of the mechanical engineering and design within the regulator station and/or pipeline right-of-way including, but not limited to, the following: o Design of pipeline included in the scope of the system. Preparation of necessary drawings to establish clearances and locate pipeline connections to components as well as location of any supports. Preparation of stress and flexibility analysis as required. Piping drawings shall locate required valves, fittings, specialties and connections. Drawings shall be suitable for general pipe fabrication and construction. Pipe support drawings shall be provided as necessary. o Specifications and lists of necessary valves, piping materials, specialties and miscellaneous items. o Preparation of cathodic protection drawings and location of equipment and materials. -------------------------------------------------------------------------------- TENASKA GEORGIA PARTNERS, L.P. Appendix A Scope ---------------------- Page 7 of 10 -------------------------------------------------------------------------------- NATURAL GAS PIPELINE Date: 9/15/99 --------------------------------------------------------------------------------
2.3 DRAWINGS The Contractor shall prepare all drawings required for procurement of equipment and materials, for construction of the facility, and for obtaining the required construction and Contractor building permits. The drawings shall show complete details of all components and types and location of all materials and equipment. The Contractor shall prepare, and maintain up-to-date, a master drawing list of all drawings, both design and vendor, for the project. The Contractor shall review and approve all vendor documents including outline drawings, diagrams, shop drawings, inspection and test procedures, samples and other vendor submissions for conformance with the design concepts and quality levels of the plant and for compliance and consistency with the Contractor's engineering calculations, drawings, and specifications. Contractor shall furnish to Tenaska for review two (2) copies of each drawing, including vendor drawings. Upon completion of the work, Contractor shall update all approved Contractor's working drawings, so that they show the final installation (as built) complete in all respects, and shall provide Tenaska with one (1) set of full size reproducibles on 3-mil Mylar base or similar material, with matte finish on both sides, three (3...
Mechanical Work. The Contractor shall perform all Mechanical work and any demolition as outlined in Attachment G Sheets M0.01 through M0.05, M1.05, M4.01, M4.02 and M5.01, M6.01 and M6.02, MD 1.05. The Contractor shall provide all materials and equipment as well as perform all labor required to install a complete and operable mechanical system.
Mechanical Work i. Sewer: connection to County sewer line, if available, or County approved septic system
ii. Water: connection to County water line
iii. Air conditioning: two window mount air conditioners for Control House
iv. Eye wash station
Mechanical Work. All types of work detailed on the mechanical syllabus to be carried out by appropriately qualified mechanical craft grades. Evidence of qualifications, must be provided to shop stewards on site should and queries arise.
Mechanical Work. The Contractor shall be responsible for the full development of the mechanical engineering and design within the switchyard.
Mechanical Work