Electric WaterHeaters Sample Clauses

Electric WaterHeaters. Electric water heaters are required to supply hot water to sanitary fixtures and shall be designed and rated in accordance with current British Standards. Electric heater units shall be of the immersed type; heating elements made of xxxxxxx-plated copper about 8 wattlcm2 density, with thermostat hot water trap and cold water inlet baffle. The units shall be made of heavy gauge stainless steel lined with improved glass or copper, with magnesium alloy or nickel chrome alloy anode and stainless steel dip tube. The units shall be provided with 50mm fibreglass insulation and enamelled steel jacket, temperature and pressure relief valves, non return valve and drain valve. Each electric water heater shall be fitted with 2 No Y2 " diameter valve for inlet and outlet water. The top and bottom covers should be made of synthetic material and shape in order to permit easy cleaning of the appliance and has an up-to-date design. The particular construction should permit rust proof installation in project location. The outlet hot water temperature should be of 60 C in winter.
AutoNDA by SimpleDocs

Related to Electric WaterHeaters

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Electric Service 1. The Authority shall make available Electric Service to enable the Customer to receive the Allocation in accordance with this Agreement, Service Tariff No. WNY-2 and the Rules. 2. The Customer shall not be entitled to receive Electric Service under this Agreement for any EP and/or RP allocation unless such EP and/or RP allocation is identified in Schedule A. 3. The Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation specified in Schedule A. If Schedule C specifies a Takedown Schedule for the Allocation, the Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation in accordance with such Takedown Schedule. 4. The Authority shall provide UCAP in amounts necessary to meet the Customer’s NYISO UCAP requirements associated with the Allocation in accordance with the NYISO Tariffs. The Customer shall be responsible to pay the Authority for such UCAP in accordance with Service Tariff No. WNY-2. 5. The provision of Electric Service associated with the Allocation is an unbundled service separate from the transmission and delivery of power and energy to the Customer. The Customer acknowledges and agrees that Customer’s local electric utility, not the Authority, shall be responsible for delivering the Allocation to the Facility specified in Schedule A in accordance with the applicable Utility Tariff(s). 6. The Contract Demand for the Customer’s Allocation may be modified by the Authority if the amount of Firm Power and Firm Energy available for sale as EP or RP from the Project is modified as required to comply with any ruling, order, or decision of any regulatory or judicial body having jurisdiction, including but not limited to FERC. Any such modification will be made on a pro rata basis to all EP and RP customers, as applicable, based on the terms of such ruling, order, or decision. 7. The Contract Demand may not exceed the Allocation. 8. The Customer’s Facility must be metered by the Customer’s local electric utility in a manner satisfactory to the Authority, or another metering arrangement satisfactory to the Authority must be provided (collectively, “Metering Arrangement”). A Metering Arrangement that is not satisfactory to the Authority shall be grounds, after notice to the Customer, for the Authority to modify, withhold, suspend, or terminate Electric Service to the Customer. If a Metering Arrangement is not made to conform to the Authority’s requirements within thirty

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts.

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!