EMBANKMENT WIDENING Sample Clauses

EMBANKMENT WIDENING. The minimum embankment widening is:  2 feet for embankment heights at centerline of 2 to 6 feet.  4 feet for embankment heights at centerline of greater than 6 feet. Purchaser shall apply embankment widening equally to both sides of the road to achieve the required width.
AutoNDA by SimpleDocs
EMBANKMENT WIDENING. The minimum embankment widening is:  2 feet for embankment heights at centerline of 2 to 6 feet.  4 feet for embankment heights at centerline of greater than 6 feet. Waste material is defined as all dirt, rock, mud, or related material that is extraneous or unsuitable for construction material. Waste material, as used in Section 4 EXCAVATION, is not organic debris.
EMBANKMENT WIDENING. Except as construction staked or designed, embankments shall be widened as follows: Height at Centerline Subgrade Widening Less than 6 feet 2 feet 6 feet or over 4 feet Embankment widening shall be applied equally to both sides of the road to achieve the required width.

Related to EMBANKMENT WIDENING

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Shopping Goods and works estimated to cost less than $100,000 equivalent per contract may be procured under contracts awarded on the basis of Shopping.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!