Emergency Corrective Work Sample Clauses

Emergency Corrective Work. If VPRA determines that emergency repairs are necessary for public safety, VPRA may perform Warranty Work. Before performing the emergency repairs, VPRA will (1) document the basis for the emergency action; and (2) preserve evidence of the defective condition. VPRA will coordinate emergency repairs with Contractor when possible. Contractor is responsible for all costs associated with the emergency repairs that are covered by the Warranty.
AutoNDA by SimpleDocs

Related to Emergency Corrective Work

  • Emergency Work Employees who are required to report for emergency work on non- workdays, or outside of their regular hours of work on a scheduled workday or on holidays which they are entitled to have off, shall be paid overtime compensation for the actual work time and for travel time in connection therewith, but such travel time shall not exceed one-half (1/2) hour.

  • Unsafe Work (a) An employee may exercise their right to refuse to do unsafe work pursuant to Section 3.12 of the Occupational Health and Safety Regulations outlined in Information Appendix B.

  • Defective Work Work that, for any reason, is not in compliance with the Contract Documents. Defective Work is usually identified in a Notice of Non-Compliant Work.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Subloop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Subloop (USL) elements as specified herein.

  • Corrective Measures If the Participating Generator fails to meet or maintain the requirements set forth in this Agreement and/or the CAISO Tariff, the CAISO shall be permitted to take any of the measures, contained or referenced in the CAISO Tariff, which the CAISO deems to be necessary to correct the situation.

  • CORRECTIVE MEASURE The contractor shall repair any deficiencies in excess of the performance guideline.

  • Correction of Defective Work 2.10.1 Design-Builder agrees to correct any Work that is found to not be in conformance with the Contract Documents, including that part of the Work subject to Section 2.9 hereof, within a period of one (1) year from the date of Final Acceptance of the Work or any portion of the Work, or within such longer period to the extent required by the Contract Documents or applicable Legal Requirements or Government Approvals.

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.

  • Emergency Work Authorizations The State, at its sole discretion, may accept the Engineer's signature on a faxed copy of the work authorization as satisfying the requirements for executing the work authorization, provided that the signed original is received by the State within five business days from the date on the faxed copy.