Emergency Diesel Generator Sample Clauses

Emergency Diesel Generator. Exhibit III(a) (continued)
AutoNDA by SimpleDocs
Emergency Diesel Generator. An emergency diesel generator shall be provided for safe shutdown of the STG in the event of loss of AC power. The generator shall be sized to feed one (1) auxiliary circulating cooling water pump, one (1) auxiliary circulating water heat exchanger pump, one (1) auxiliary closed loop cooling water pump, one (1) STG main lube oil pump, and one (1) STG turning gear.
Emergency Diesel Generator. 16. Electrical and Control Systems
Emergency Diesel Generator. During the installation of the backup Emergency Diesel Generator (EDG) at WCP, an electrical connection from the EDG to RS was provided in order to supply emergency backup power to RS in addition to WCP. Due to differences in auxiliary power voltages between the two facilities, a transformer was installed at RS to accommodate the electrical connection to RS. Each owner will be solely responsible for their respective electrical feeds, including any transformers, from the first electrical termination to the EDG. As such, WCP shall provide RS with access to any portion of electrical feed which resides on WCP’s property in order to perform maintenance and repairs as required. EDG specific maintenance and testing will be performed by and at the discretion of WCP personnel except where testing will impact the RS facility in which case testing shall be coordinated between the two facilities. Documented EDG variable maintenance and testing costs will be equally split between the two facilities. Air permit compliance of the EDG shall be the sole responsibility of WCP. Any significant planned maintenance to the EDG will be communicated by WCP to RS to ensure RS has the opportunity to capture these expenses in their annual budget. The EDG shall be successfully tested to ensure emergency loads at both WCP and RS can be accommodated prior to RS reimbursement of any EDG maintenance and testing costs, which testing shall include confirmation that the RS bus which is supplied power by the EDG is energized and functional. The test will consist of energizing the emergency feed from the WCP emergency generator through the new RS circuit (i.e., energization of the new ABB transformer up to the new manual 480 V feeder breaker), a check of the sequencing of the phases and such other steps as the parties may mutually agree. In addition, RS shall have the right to disconnect from the EDG at any point in the future upon 90 days prior written notice. If RS choses to disconnect from the EDG, WCP shall be solely responsible for all costs associated with the on-going testing, maintenance, and repairs of the EDG after the disconnection date.

Related to Emergency Diesel Generator

  • Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Emergency Repairs In the event Emergency Repairs are needed at the Hotels, Manager shall be required to use its good faith efforts to obtain Lessee’s verbal approval of any Emergency Repairs prior to making any expenditure therefor. In the event Manager is unable to contact Lessee to obtain its verbal approval of Emergency Repairs, then Manager is authorized to enter into contracts occasioned by such emergency that provide for expenditures not contemplated by the Annual Business Plan up to a sum of $50,000, and provided the same may be incurred under the Loan Documents. Manager will promptly give Lessee written notice of any Emergency Repairs made by Manager.

  • Emergency Services HMO policy and procedures, Covered Services, claims adjudication methodology, and reimbursement performance for Emergency Services must comply with all applicable state and federal laws, rules, and regulations including 42 C.F.R. §438.114, whether the provider is in-network or Out-of-Network. HMO policies and procedures must be consistent with the prudent layperson definition of an Emergency Medical Condition and the claims adjudication processes required under the Contract and 42 C.F.R. §438.114. The HMO must pay for the professional, facility, and ancillary services that are Medically Necessary to perform the medical screening examination and stabilization of a Member presenting with an Emergency Medical Condition or an Emergency Behavioral Health Condition to the hospital emergency department, 24 hours a day, 7 days a week, rendered by either the HMO's Network or Out-of-Network providers. The HMO cannot require prior authorization as a condition for payment for an Emergency Medical Condition, an Emergency Behavioral Health Condition, or labor and delivery. The HMO cannot limit what constitutes an Emergency Medical Condition on the basis of lists of diagnoses or symptoms. The HMO cannot refuse to cover Emergency Services based on the emergency room provider, hospital, or fiscal agent not notifying the Member’s PCP or the HMO of the Member’s screening and treatment within 10 calendar days of presentation for Emergency Services. The HMO may not hold the Member who has an Emergency Medical Condition liable for payment of subsequent screening and treatment needed to diagnose the specific condition or stabilize the patient. The HMO must accept the emergency physician or provider’s determination of when the Member is sufficiently stabilized for transfer or discharge.

  • Emergency If a well goes out of control or a fire, blow out, sabotage or other emergency occurs prior to the effective date of a Party’s withdrawal, the withdrawing Party shall remain liable for its Participating Interest share of the costs of such emergency, regardless of when they are incurred.

  • HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.

  • Heating and Air Conditioning Tenant shall not use any method of heating or air-conditioning, other than that supplied by Landlord, without Landlord’s prior written consent.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.