Emergency Load Response Program Sample Clauses

Emergency Load Response Program. The Emergency Load Response Program is the program by which Curtailment Service Providers may be compensated by PJM for Demand Resources that will reduce load when dispatched by PJM during emergency conditions, and is described in Section 8 of Schedule 1 of the Operating Agreement and the parallel provisions of Section 8 of Attachment K-Appendix of the Tariff.
AutoNDA by SimpleDocs
Emergency Load Response Program. Formatted: Space After: 10 pt, Line spacing: Multiple 1.15 li Formatted: Level 4

Related to Emergency Load Response Program

  • Emergency Response Partners must develop, maintain, and carry out a response plan for public water system emergencies, including disease outbreaks, spills, operational failures, and water system contamination. Partners must notify DWS in a timely manner of emergencies that may affect drinking water supplies.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Contingent Emergency Response 1. In order to ensure the proper implementation of contingent emergency response activities under Part 4 of the Project (“Contingent Emergency Response Part”), the Recipient shall ensure that: (a) a manual (“CERC Manual”) is prepared and adopted in form and substance acceptable to the Association, which shall set forth detailed implementation arrangements for the Contingent Emergency Response Part, including: (i) any structures or institutional arrangements for coordinating and implementing the Contingent Emergency Response Part;

  • Emergency/Declared Disaster Requirements In the event of an emergency or if Orange County is declared a disaster area by the County, state or federal government, this Contract may be subjected to unusual usage. The Contractor shall service the County during such an emergency or declared disaster under the same terms and conditions that apply during non-emergency/disaster conditions. The pricing quoted by the Contractor shall apply to serving the County’s needs regardless of the circumstances. If the Contractor is unable to supply the goods/services under the terms of the Contract, then the Contractor shall provide proof of such disruption and a copy of the invoice for the goods/services from the Contractor’s supplier(s). Additional profit margin as a result of supplying goods/services during an emergency or a declared disaster shall not be permitted. In the event of an emergency or declared disaster, emergency purchase order numbers will be assigned. All applicable invoices from the Contractor shall show both the emergency purchase order number and the Contract number.

  • Substance Abuse Program The SFMTA General Manager or designee will manage all aspects of the FTA-mandated Substance Abuse Program. He/she shall have appointing and removal authority over all personnel working for the Substance Abuse Program personnel, and shall be responsible for the supervision of the SAP.

  • Emergency Situation In the event of an emergency situation beyond our reasonable control, such as an "act of God," war, fire, or natural disaster, services involving your account could be available only in a modified or reduced form or could be entirely unavailable. Unless expressly prohibited by applicable law, you agree that we will have no liability to you for such modification, reduction, or unavailability of services caused by an emergency situation.

  • Line Item Question Response 46 Do your warranties cover all products, parts, and labor? Warranties are those supplied by the equipment manufacturers. Generally cover parts and labor. * 47 Do your warranties impose usage restrictions or other limitations that adversely affect coverage? Warranty will not cover abuse or lack of maintenance. * 48 Do your warranties cover the expense of technicians' travel time and mileage to perform warranty repairs? Yes * 49 Are there any geographic regions of the United States or Canada (as applicable) for which you cannot provide a certified technician to perform warranty repairs? How will Sourcewell participating entities in these regions be provided service for warranty repair? We have coverage in the United States. * 50 Will you cover warranty service for items made by other manufacturers that are part of your proposal, or are these warranties issues typically passed on to the original equipment manufacturer? We warranty any work we preform. The equipment is covered by the original equipment manufacturer. * 51 What are your proposed exchange and return programs and policies? Special order items are not returnable and will not be exchanged. If a manufacture will take back an item they consider returnable, the return must have an RMA and be returned within 90 days in the original carton. All freight, restocking, damage plus a service fee will be deducted form the credit for equipment. * 52 Describe any service contract options for the items included in your proposal. We offer preventative maintenance contracts for refrigeration equipment in Texas. DFW, Houston, Beaumont and Austin. * 53 Describe your payment terms and accepted payment methods. Standard payment terms are Net 30 days. To be considered for an open account, all new customers will be required to complete a New Customer Application and provide tax exemption certification if applicable. All applicants are subject to Strategic's Credit Terms and Policies and must meet criteria specified therein. Finance charges of 1/5% per month (18% APR) or the maximum rate that an applicant may lawfully contract to pay, whichever is less, on any payment Seller considers past due until collected. Accepted payment methods include check, ACH, wire transfer, credit card * 54 Describe any leasing or financing options available for use by educational or governmental entities. TriMark Strategic has developed business relationships with several reputable third-party leasing companies and can provide Sourcewell customers with information regarding this option upon request. * 55 Describe any standard transaction documents that you propose to use in connection with an awarded contract (order forms, terms and conditions, service level agreements, etc.). Upload a sample of each (as applicable) in the document upload section of your response. Strategic will require a valid Purchase Order from Sourcewell customers. Upon acceptance, Strategic will agree to the terms and conditions set forth in the Purchase Order. All quotes submitted by Strategic to Sourcewell customers will be on a standard Quotation Form and will have this statement regarding the Terms of Sale: "This Quote shall be subject to Trimark's Terms of Sale http//xxx.xxxxxxxxxx.xxx/XxxxXxxxx/XxxxXxxxxxxxx/Xxxx/XxxXxxx-Xxxxx- and-Conditions-of-Sale.pdf, which are incorporated herein by reference. The customer's Purchase Order terms and conditions shall govern. *

  • Optional Xactimate Response Attachment (Part 2)

  • Timely and Sustained Response Interconnection Customer shall ensure that the Small Generating Facility’s real power response to sustained frequency deviations outside of the deadband setting is automatically provided and shall begin immediately after frequency deviates outside of the deadband, and to the extent the Small Generating Facility has operating capability in the direction needed to correct the frequency deviation. Interconnection Customer shall not block or otherwise inhibit the ability of the governor or equivalent controls to respond and shall ensure that the response is not inhibited, except under certain operational constraints including, but not limited to, ambient temperature limitations, physical energy limitations, outages of mechanical equipment, or regulatory requirements. The Small Generating Facility shall sustain the real power response at least until system frequency returns to a value within the deadband setting of the governor or equivalent controls. An Applicable Reliability Standard with equivalent or more stringent requirements shall supersede the above requirements.

  • Emergency Transition Registry Operator agrees that, in the event that any of the emergency thresholds for registry functions set forth in Section 6 of Specification 10 is reached, ICANN may designate an emergency interim registry operator of the registry for the TLD (an “Emergency Operator”) in accordance with ICANN’s registry transition process (available at <xxxx://xxx.xxxxx.xxx/en/resources/registries/transition-­‐processes>) (as the same may be amended from time to time, the “Registry Transition Process”) until such time as Registry Operator has demonstrated to ICANN’s reasonable satisfaction that it can resume operation of the registry for the TLD without the reoccurrence of such failure. Following such demonstration, Registry Operator may transition back into operation of the registry for the TLD pursuant to the procedures set out in the Registry Transition Process, provided that Registry Operator pays all reasonable costs incurred (i) by ICANN as a result of the designation of the Emergency Operator and (ii) by the Emergency Operator in connection with the operation of the registry for the TLD, which costs shall be documented in reasonable detail in records that shall be made available to Registry Operator. In the event ICANN designates an Emergency Operator pursuant to this Section 2.13 and the Registry Transition Process, Registry Operator shall provide ICANN or any such Emergency Operator with all data (including the data escrowed in accordance with Section 2.3) regarding operations of the registry for the TLD necessary to maintain operations and registry functions that may be reasonably requested by ICANN or such Emergency Operator. Registry Operator agrees that ICANN may make any changes it deems necessary to the IANA database for DNS and WHOIS records with respect to the TLD in the event that an Emergency Operator is designated pursuant to this Section 2.13. In addition, in the event of such failure, ICANN shall retain and may enforce its rights under the Continued Operations Instrument.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!