Emergency Shutdowns – Zone A Plant Sample Clauses

Emergency Shutdowns – Zone A Plant. In the event of an emergency shutdown of the Xxxxxxx Canyon Plant, Kennecott shall provide JVWCD with as much notice of the shutdown as is possible by the best practicable means under the circum- stances, and shall have the right to cease operating such plant or facilities during the shutdown. Any such shutdown shall not be deemed to be a breach of this Project Agree- ment and shall not create any liability on the part of Kennecott; provided that Kennecott shall use all reasonable efforts to perform the repair work as quickly as possible.
AutoNDA by SimpleDocs

Related to Emergency Shutdowns – Zone A Plant

  • Emergency Generator 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator. 2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease. 3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in accordance with the Lease and this Amendment. Tenant shall repair any damage caused by such removal, including the patching of any holes to match, as closely as possible, the color surrounding the area where the Generator and appurtenances were attached. Such maintenance and operation shall be performed in a manner to avoid any unreasonable interference with any other tenants or Landlord. Tenant agrees to maintain the Generator, including without limitation, any enclosure installed around the Generator, in good condition and repair. Tenant shall be responsible for performing any maintenance and improvements to any enclosure surrounding the Generator so as to keep such enclosure in good condition. 4) Tenant, subject to the reasonable rules and regulations enacted by Landlord, shall have unlimited access to the Generator and its surrounding area for the purpose of installing, operating, repairing, maintaining, using and removing the Generator. 5) Tenant shall only test the Generator before or after normal business hours. 6) Notwithstanding anything in this Amendment or the Lease to the contrary, Tenant may use the Generator for its intended purpose as and when needed (as reasonably determined by Tenant), without any restriction or hindrance from Landlord or any other tenant, subject only to applicable Laws and unreasonable disturbances to other tenants in the Project.

  • Emergency Work Employees who are required to report for emergency work on non- workdays, or outside of their regular hours of work on a scheduled workday or on holidays which they are entitled to have off, shall be paid overtime compensation for the actual work time and for travel time in connection therewith, but such travel time shall not exceed one-half (1/2) hour.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Emergency/Declared Disaster Requirements In the event of an emergency or if Orange County is declared a disaster area by the County, state or federal government, this Contract may be subjected to unusual usage. The Contractor shall service the County during such an emergency or declared disaster under the same terms and conditions that apply during non-emergency/disaster conditions. The pricing quoted by the Contractor shall apply to serving the County’s needs regardless of the circumstances. If the Contractor is unable to supply the goods/services under the terms of the Contract, then the Contractor shall provide proof of such disruption and a copy of the invoice for the goods/services from the Contractor’s supplier(s). Additional profit margin as a result of supplying goods/services during an emergency or a declared disaster shall not be permitted. In the event of an emergency or declared disaster, emergency purchase order numbers will be assigned. All applicable invoices from the Contractor shall show both the emergency purchase order number and the Contract number.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Emergency Closure Where there is a temporary closure as a result of an immediate emergency or a planned temporary closure due to renovations, repairs, or moves, the Employer will: a) First offer to the affected employees the choice of taking either a vacation day or an unpaid leave of absence with no loss of seniority or benefits; thereafter, at the Employer's discretion, one of the following: b) Reassign staff to another location; c) Reschedule the lost hours within two (2) pay periods; or d) Decide not to do either (b) or (c), in which case employees shall still be paid for their regularly scheduled hours which they did not work as a result of the temporary layoff.

  • Emergency Escalation Escalation is strictly for purposes of notifying and investigating possible or potential issues in relation to monitored services. The initiation of any escalation and the subsequent cooperative investigations do not in themselves imply that a monitored service has failed its performance requirements. Escalations shall be carried out between ICANN and Registry Operators, Registrars and Registry Operator, and Registrars and ICANN. Registry Operators and ICANN must provide said emergency operations departments. Current contacts must be maintained between ICANN and Registry Operators and published to Registrars, where relevant to their role in escalations, prior to any processing of an Emergency Escalation by all related parties, and kept current at all times.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.