Encroaching Vegetation Sample Clauses

Encroaching Vegetation. Contractor shall maintain encroaching vegetation to Xxxxxxx’x property line. In the event the encroaching vegetation has not previously been maintained to Xxxxxxx’x property line or has significantly intruded over Xxxxxxx’x property line (such as a large overhanging tree), Xxxxxxx may approve trimming of such encroaching vegetation as Extra Work. Following the initial pruning event approved as Extra Work, Contractor shall maintain the encroaching vegetation as part of the regular monthly Contract expense.
AutoNDA by SimpleDocs

Related to Encroaching Vegetation

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Encroachments If any of the Leased Improvements on any Leased Property shall, at any time, encroach upon any property, street or right-of-way adjacent to such Leased Property, then, promptly upon the request of Lessor or at the behest of any person affected by any such encroachment, Tenant shall, at its expense, subject to its right to contest the existence of any encroachment and, in such case, in the event of any adverse final determination, either (i) obtain valid and effective waivers or settlements of all claims, liabilities and damages resulting from each such encroachment, whether the same shall affect Lessor or Tenant, or (ii) make such changes in the Leased Improvements, and take such other actions, as Tenant, in good faith exercise of its judgment deems reasonably practicable, to remove such encroachment, including, if necessary, the alteration of any of the Leased Improvements, and in any event take all such actions as may be necessary in order to be able to continue the operation of the Leased Improvements for the Primary Intended Use substantially in the manner and to the extent the Leased Improvements were operated prior to the assertion of such encroachment. Any such alteration shall be made in conformity with the applicable requirements of ARTICLE X. Tenant’s obligations under this Section 9.2 shall be in addition to and shall in no way discharge or diminish any obligation of any insurer under any policy of title or other insurance and Tenant shall not be entitled to a credit for any sums recovered by Lessor under any such policy of title or other insurance.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Trees 1) Any major tree surgery or tree removal over a three (3) inch diameter, which becomes necessary through no fault of the Contractor, will be at the County's expense.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Project Site The “Project Site” is the place where the Work is being carried on.

Time is Money Join Law Insider Premium to draft better contracts faster.