Erosion Control (PL1 Sample Clauses

Erosion Control (PL1. 2.5) As a mitigation measure, MMB proposed the implementation of an erosion control plan to ensure the minimization of sediment transportation during rainstorm events. The plan will be adapted for construction and for operation. In the first stage, the main objective will be the preservation of superficial materials for future reclamation work; for the operation stage, the plan will be designed as a mitigation measure for open cut mining operations and associated disturbance. A detailed, typical erosion control plan was presented in the MIA-EIM. This typical will be tailored to site conditions through a pilot program, to be conducted prior to the re-initiation of construction, and will receive further refinement as a greater understanding of site surface and hydrologic conditions is gained. Environmental and Social Action Plan Page 33
AutoNDA by SimpleDocs
Erosion Control (PL1. 2.5) Design: a pilot program will be conducted during the first two quarters of 2010 in conjunction with the pilot program for the conservation of surficial materials. During this pilot program, various control measures will be constructed to optimize designs and construction techniques. A site-specific field manual will be developed as a result of this pilot program, and methods will be updated as the techniques are tested by rainfall events. A control program for movement of marine and perimarine sediments associated with construction of the Boleo marine transport facility will be instituted in conformance with the mitigation actions specified in the MIA-EIM for that facility. Implementation: Erosion control is an ongoing program of prevention and sediment control that will occur ahead of and concurrent with construction and operations activities. It is expected to be an active program throughout the life of the project.
Erosion Control (PL1. 2.5) This program is considered to encompass conservation of surficial materials, as well as prevention of erosion and control of sediment. A pilot program was initiated in collaboration with REBIVI beginning the first quarter of 2010 to select and refine techniques appropriate for a desert region affected by cyclonic precipitation and the information gained from that program will be used to implement the site wide program. This program must be executed in conjunction with other control and compliance programs to insure it is properly integrated with construction activities.

Related to Erosion Control (PL1

  • Control Areas Tenant shall be allowed to utilize up to its pro rata share of the Hazardous Materials inventory within any control area or zone (located within the Premises), as designated by the applicable building code, for chemical use or storage. As used in the preceding sentence, Tenant’s pro rata share of any control areas or zones located within the Premises shall be determined based on the rentable square footage that Tenant leases within the applicable control area or zone. For purposes of example only, if a control area or zone contains 10,000 rentable square feet and 2,000 rentable square feet of a tenant’s premises are located within such control area or zone (while such premises as a whole contains 5,000 rentable square feet), the applicable tenant’s pro rata share of such control area would be 20%.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Compliance Control Services (1) Support reporting to regulatory bodies and support financial statement preparation by making the Fund's accounting records available to the Trust, the Securities and Exchange Commission (the “SEC”), and the independent accountants.

  • Pest Control Landlord will be responsible for termite and rodent control. Landlord shall not provide pest control services (which include the removal of ants, cockroaches, spiders and other insects). If the Tenant has a xxxxx infestation after they move in they will be considered the cause of it and charged for the treatments. A pest control company will be sent to the property after the first 6 months of the lease, if an issue is found the tenants will be charged for the treatments.

  • Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.

  • Access Control Landlord shall be the sole determinant of the type and amount of any access control or courtesy guard services to be provided to the Project, if any. IN ALL EVENTS, LANDLORD SHALL NOT BE LIABLE TO TENANT, AND TENANT HEREBY WAIVES ANY CLAIM AGAINST LANDLORD, FOR (I) ANY UNAUTHORIZED OR CRIMINAL ENTRY OF THIRD PARTIES INTO THE PREMISES, THE BUILDING OR THE PROJECT, (II) ANY DAMAGE TO PERSONS, OR (III) ANY LOSS OF PROPERTY IN AND ABOUT THE PREMISES, THE BUILDING OR THE PROJECT, BY OR FROM ANY UNAUTHORIZED OR CRIMINAL ACTS OF THIRD PARTIES, REGARDLESS OF ANY ACTION, INACTION, FAILURE, BREAKDOWN, MALFUNCTION AND/OR INSUFFICIENCY OF THE ACCESS CONTROL OR COURTESY GUARD SERVICES PROVIDED BY LANDLORD, IF ANY. Tenant shall provide such supplemental security services and shall install within the Premises such supplemental security equipment, systems and procedures as may reasonably be required for the protection of its employees and invitees, provided that Tenant shall coordinate such services and equipment with any security provided by Landlord. The determination of the extent to which such supplemental security equipment, systems and procedures are reasonably required shall be made in the sole judgment, and shall be the sole responsibility, of Tenant. Tenant acknowledges that it has neither received nor relied upon any representation or warranty made by or on behalf of Landlord with respect to the safety or security of the Premises or the Project or any part thereof or the extent or effectiveness of any security measures or procedures now or hereafter provided by Landlord, and further acknowledges that Tenant has made its own independent determinations with respect to all such matters.

  • Quality Control Procedures The Seller must have an internal quality control program that verifies, on a regular basis, the existence and accuracy of the legal documents, credit documents, property appraisals, and underwriting decisions. The program must be capable of evaluating and monitoring the overall quality of its loan production and servicing activities. The program is to ensure that the Mortgage Loans are originated and serviced in accordance with prudent mortgage banking practices and accounting principles; guard against dishonest, fraudulent, or negligent acts; and guard against errors and omissions by officers, employees, or other authorized persons.

  • Plan Document Controls The rights granted under this Agreement are in all respects subject to the provisions set forth in the Plan to the same extent and with the same effect as if set forth fully in this Agreement. If the terms of this Agreement conflict with the terms of the Plan document, the Plan document will control.

  • Internal Control Over Financial Reporting The Company and each of its Subsidiaries maintain a system of internal control over financial reporting (as such term is defined in Rule 13a-15(f) of the Exchange Act Regulations) that complies with the requirements of the Exchange Act and the Exchange Act Regulations and has been designed by the Company’s principal executive officer and principal financial officer and is sufficient to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP, including that (A) transactions are executed in accordance with management’s general or specific authorizations; (B) transactions are recorded as necessary to permit preparation of financial statements in conformity with GAAP and to maintain asset accountability; (C) access to assets is permitted only in accordance with management’s general or specific authorization; (D) the recorded accountability for assets is compared with the existing assets at reasonable intervals and appropriate action is taken with respect to any differences; and (E) the interactive data in eXtensible Business Reporting Language included or incorporated by reference in the Registration Statement is accurate and fairly presents the information called for in all material respects and has been prepared in accordance with the Commission’s rules and guidelines applicable thereto. The systems of internal control over financial reporting of the Company and its Subsidiaries are overseen by the Audit Committee of the Board of Directors of the Company in accordance with Nasdaq rules and regulations. Except as described in the Registration Statement, the Pricing Disclosure Package and the Prospectus, since the end of the Company’s most recent audited fiscal year, (i) there has been no material weakness in the Company’s internal control over financial reporting (whether or not remediated), (ii) there has been no change in the Company’s internal control over financial reporting that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting and (iii) the Company has not been advised of (a) any significant deficiencies in the design or operation of internal controls that could adversely affect the ability of the Company or any Subsidiary to record, process, summarize and report financial data, or any material weakness in internal controls, or (b) any fraud, whether or not material, that involves management or other employees who have a significant role in the internal controls of the Company and each of the Subsidiaries.

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

Time is Money Join Law Insider Premium to draft better contracts faster.