Erosion Control Structure Maintenance. During the period of this SPA, shall provide maintenance of soil erosion control structures constructed by until they become stabilized, but not for more than one year after their construction. Slash Disposal. ’s timing of product removal and preparatory work shall not unnecessarily delay slash disposal. Specific slash disposal measures to be employed by are stated in Appendix E. Scaling. Scaling includes: Various volume determination methods, such as log rule, sampling, measuring, linear measuring, counting, weighing, or another method or combination of methods; Various sites, such as truck Scaling stations, rollways, weighing stations, xxxxx landings, water Scaling stations, or other sites. Various geographic locations.
Appears in 3 contracts
Samples: Stewardship Agreement, Stewardship Agreement, Stewardship Agreement
Erosion Control Structure Maintenance. During the period of this SPAStewardship Agreement, shall provide maintenance of soil erosion control structures constructed by until they become stabilized, but not for more than one year after their construction. Slash Disposal. ’s timing of product removal and preparatory work shall not unnecessarily delay slash disposal. Specific slash disposal measures to be employed by are stated in Appendix E. Scaling. Scaling includes: Various volume determination methods, such as log rule, sampling, measuring, linear measuring, counting, weighing, or another method or combination of methods; Various sites, such as truck Scaling stations, rollways, weighing stations, xxxxx landings, water Scaling stations, or other sites. Various geographic locations.
Appears in 2 contracts
Samples: Stewardship Agreement, Stewardship Agreement